12
pre
-
operation
Pre-Operation HL062B & HL127B
UNPACKING
ASSEMBLY
1. Remove heater from carton.
2. Remove all protective material which may have been applied to the
heater for shipment.
3. Check the heater for possible shipping damage. If any damage is
found, contact the manufacturer immediately.
NOTE:
Save the box and packaging materials for future storage.
1. Align the holes in the upper housing with the 2 holes in the handle as
shown.
2. Insert and tighten screws securely with screw driver.
Summary of Contents for HK077B
Page 1: ...user manual FORCED AIR HEATER BEPOWEREQUIPMENT COM HL062B HL127B HK077B HK217B...
Page 2: ...2...
Page 22: ...22 WIRING DIAGRAMS diagrams HL062B HL127B HK077B HK217B...
Page 23: ...23 PARTS BREAKDOWN HL062B HL127B diagrams...
Page 24: ...24 diagrams PARTS BREAKDOWN HK077B...
Page 25: ...25 diagrams PARTS BREAKDOWN HK217B...
Page 27: ...27 maintenance notes...
Page 32: ...sch mas 25 LISTE DES PI CES HK217B...
Page 33: ...LISTE DES PI CES HK077B sch mas 24...
Page 34: ...LISTE DES PI CES HL062B HL127B sch mas 23...
Page 35: ...Sch mas SCH MAS DE C BLAGE HL062B HL127B sch mas 22 SCH MAS DE C BLAGE HK077B HK217B...
Page 55: ...2...
Page 56: ...manuel d utilisation RADIATEURS AIR PULS BEPOWEREQUIPMENT COM HL062B HL127B HK077B HK217B...