
Quality Assurance on the BD FocalPoint™ Slide Profiler
189
19.4 Training Records
Training will be conducted by BD.
Copies of training documentation for all staff will be made
available to the laboratory for their files.
19.5 System Performance Verification
This section describes the BD FocalPoint™ Slide Profiler automated quality control monitoring
system, System Integrity (SI), and the procedures necessary to print reports containing the
results of the SI tests and any system messages.
19.5.1
SI Overview
The quality of the automatic screening performed by the BD FocalPoint™ Slide Profiler is
assured by periodic, comprehensive monitoring of all components. Through a process called
System Integrity (SI), all motion, electrical, illumination, image collection, and image processing
components are verified. SI tests are performed before the first tray and after each succeeding
tray is processed. If any component fails a SI test, the slide results for the previous tray are
invalidated. The system next attempts to recalibrate itself, and, upon successful recalibration,
begins processing the next tray. If an SI test fails, a recovery process is automatically invoked. SI
is repeated up to four times after recalibration. Continued failure of one or more of the System
Integrity tests causes the instrument to stop processing.
SI also monitors any drift in the operating parameters and may initiate automatic recalibration to
ensure that calibration is performed well before calibration limits are exceeded. When this
occurs, slide results for the previous tray are not invalidated.
For more information about SI, see Section 23.
19.5.2
Test Information Reporting
During normal operation, the system logs all calibration and SI results and slide processing data
into the system log. Data is included for the following:
•
Automatic calibration results and parameters
•
SI test results and comparison to limits
•
Slide scanning results and parameters
The system log documents all system quality control testing and provides data for process
monitoring and trend analysis.
To document instrument quality control, your laboratory must keep a record of SI results. The
procedure for tracking SI results is described under the heading Section 19.5.3. Individual test
failures are always recorded in the system log. Use the
System Message
command to print a list
of any failures recorded in the system log. The procedure for printing the system messages is
described under the heading Section 19.5.4.
Summary of Contents for FocalPoint GS
Page 10: ...BD FocalPoint GS Imaging System Instrument User s Manual 10...
Page 44: ...BD FocalPoint GS Imaging System Instrument User s Manual 44...
Page 54: ...BD FocalPoint GS Imaging System Instrument User s Manual 54...
Page 58: ...BD FocalPoint GS Imaging System Instrument User s Manual 58...
Page 76: ...BD FocalPoint GS Imaging System Instrument User s Manual 76...
Page 86: ...BD FocalPoint GS Imaging System Instrument User s Manual 86...
Page 110: ...BD FocalPoint GS Imaging System Instrument User s Manual 110...
Page 126: ...BD FocalPoint GS Imaging System Instrument User s Manual 126...
Page 156: ...BD FocalPoint GS Imaging System Instrument User s Manual 156...
Page 192: ...BD FocalPoint GS Imaging System Instrument User s Manual 192...
Page 200: ...BD FocalPoint GS Imaging System Instrument User s Manual 200...
Page 204: ...BD FocalPoint GS Imaging System Instrument User s Manual 204...
Page 206: ...BD FocalPoint GS Imaging System Instrument User s Manual 206...
Page 210: ...BD FocalPoint GS Imaging System Instrument User s Manual 210...
Page 212: ...BD FocalPoint GS Imaging System Instrument User s Manual 212...
Page 218: ...BD FocalPoint GS Imaging System Instrument User s Manual 218...
Page 224: ...BD FocalPoint GS Imaging System Instrument User s Manual 224...