19
(D)
Insert the new Motor Brush
Assembly.
(A)
Verify the Water Flow Control
Valve is open.
(A)
Verify the ON/OFF Switch is in
the ON position.
(B)
Verify all electrical connections
and ensure the GFCI is
not tripped.
(C)
Verify circuit breaker is not
tripped, if it is tripped – reset
the circuit breaker once.
(E)
Using a flat blade screw-
driver install the Motor Brush
Housing cover.
(B)
Ensure the Water Supply
Line is connected properly.
(F)
Repeat Steps A through
E for second Motor Brush
Assembly.
Loss of Cooling Flow
Electrical Problems
BD-125WP
MAINTENANCE
When performing Steps E and F, ensure the Motor Brush Assembly remains
correctly seated at all times.
NOTE:
Summary of Contents for BD-125WP
Page 26: ...26 NOTES...
Page 27: ...27 NOTES...