![Bayer HealthCare ON DEMAND Maintenance Manual Download Page 25](http://html1.mh-extra.com/html/bayer-healthcare/on-demand/on-demand_maintenance-manual_2712825025.webp)
END OF SEASON:
Reverse pumps to clear all product from lines.
Remove kegs from scales.
Remove Manifold from treating head and insert in bucket.
Install rinsing socket and flush lines with water till clear.
Clean manifold.
Remove filters on pump stations and clean.
Replace all pump elements - ensure proper size of replacements: (73 for IP pump and 15 for
LS pump).
Replace chemical lines to treater as needed.
Remove transition chute and clean atomizer and chamber.
Clean Air release valves.
Clean Drum.
Grease pillow block bearings.
Clean air filters on main panel.
Power down main panel and HMI (HMI Must remain plugged in to a live outlet at all times).
25