24
Step 12:
Insert the other end of the factory supplied Pump Element into the orange Fitting Receptacle on the In-line Strainer
Vibration Mount, as shown.
Step 13:
Close Pump Head (up position), as shown.
Step 14:
Connect the Pump Power Cord through the back side of the Pump Stand to the Pump, as shown