Bayer HealthCare CBT BASIC TURNKEY 80996381 User Manual Download Page 12

12

Step 6:

 

Turn the Pump Drive Switch

 

OFF

PUSH BUTTON 

TO RELEASE

CONNECT 

TO FITTING

Step 7:

 

Push the Quick Disconnect Bulkhead fitting gray 

button to release and remove the Quick Disconnect Elbow.

•  Connect the Quick Disconnect Elbow to the Quick 

Disconnect fitting, located above the Chemical Inlet. 

Step 8:

 

Repeat the Calibration process for 

LIQUID PUMP 

#2

,if used.

Summary of Contents for CBT BASIC TURNKEY 80996381

Page 1: ...CBT BASIC TURNKEY 80996381...

Page 2: ...is specific to this User Manual 2 System Calibration Liquid Run Sequence Menu Tip Previous Note Advance Example Time Hand Cursor Like Installation Clothing HMI Display Gloves Lift Points Warning Caut...

Page 3: ...t click on the icon tiles Pictograms 3 System Diagram Pump Cal Installation HMI Display Run Sequence Users can advance or go back single pages by using quick navigation links shown below right Users c...

Page 4: ...30VAC 3ph 60Hz 30A Capacity up to 100kg 200lbs CBT BASIC TURNKEY ASSEMBLY Seed Inlet Hopper Air Regulator Control Panel Chemical Inlet Wand Caster Kit 4 Chemical Inlet Dust Evac Filter Bag spare Dust...

Page 5: ...sible to electricity and compressed air Allow access to the Treater from all sides for the purpose of adjustments maintenance and clean up Provide 230VAC 3 ph 60 Hz 30a Service for the CBT control box...

Page 6: ...anual for proper installation and operation details Step 3 Open the Pump Head Insert one end of the Pump Element into the lower fitting on the inside of the Hopper Frame Set the Pump Element on the Pu...

Page 7: ...Connect to external power source Step 5 Connect the Digital Scale 115VAC Power Cord to the back of the Digital Scale Connect the Digital Scale 115VAC Power Cord to an external power source Step 6 Inse...

Page 8: ...connect Elbow to the Quick Disconnect Bulkhead fitting located above the Calibrated Cylinder The chemical Transfer line stays connected to the Quick Disconnect Elbow Warning Exercise extreme caution w...

Page 9: ...eed Example 5 ounces of treatment cwt of seed at a dilution rate of 1 1 with water equals 10 ounces cwt of total treatment RATE If listed in ounces convert to ml 1 oz 29 6 ml Example 10 ounces x 29 6...

Page 10: ...duated Cylinder on the Digital Scale Release the Liquid Pump 1 Switch returns to OFF position and the ON light turns off Continued Step 4 Push the LS Pump Control switch to FWD The green Power light w...

Page 11: ...ted Beaker back into the Supply Tank Adjust the LS Pump Control Speed Indicator Dial to increase or decrease Pump dispersion rate output speed Faster more chemical pumped slower less Repeat Steps 4 6...

Page 12: ...ING Step 7 Push the Quick Disconnect Bulkhead fitting gray button to release and remove the Quick Disconnect Elbow Connect the Quick Disconnect Elbow to the Quick Disconnect fitting located above the...

Page 13: ...n on the Control Panel to initiate the system The HMI Display populates the preset PLC information SCREEN 1 F1 Displays the accumulating times of the following timers DUMP TIME PUMP TIME DRYING TIME D...

Page 14: ...screen forwards F3 button moves the cursor up Values displayed are pre set from the factory based on customer specifications Values can be changed to reflect batch needs BAYER TIME ACC 0 0 F1 F2 F3 F...

Page 15: ...L FILL TMR Amount of time to fill the Mixing Bowl PUMP 1 TMR Amount of time chemical is applied to the seed PUMP 2 TMR Amount of time chemical is applied to the seed SCREEN 4 F4 Displays contact infor...

Page 16: ...If there is seed left in the hopper the operator will increase the Bowl Filling Timer or if there is not enough or too much chemical the operator will adjust the Pump 1 Timer If the seed is too wet wh...

Page 17: ...R TIME ACC 0 0 SCREEN 2 F2 Displays contact information BAYER 800 634 6738 F1 F2 F3 F4 F5 F6 F7 F8 BAYER TIME ACC 0 0 On the PLC DISPLAY SCREEN press F2 Advance to SCREEN 2 the preset values of PUMP 1...

Page 18: ...ARE DISPLAYED IN SECONDS 3 From the PLC DISPLAY SCREEN press F4 a cursor will appear at the far right bottom number Use the ARROW UP F3 to move the cursor up to the next timer value EXAMPLE FROM PUMP...

Page 19: ...nsure a collection bin or bagging device is located underneath or affixed to the Seed Discharge Step 2 Fill the inlet hopper with clean seed up to 100kg 200lbs Continued Warning Wear proper personal p...

Page 20: ...system AUTO FWD RUN REV 54 0 M R F I O RUN STOP BOWL MOTOR Step 4 Turn the Bowl switch ON The ON light above the switch turns on The Bowl speed may be increased using the Bowl Motor touch pad arrows...

Page 21: ...UID PUMP 1 OFF ON ON BLOWER MOTOR ON LIQUID PUMP 2 Step 5 Turn ON the following switches Blower Motor Atomizer Motor Liquid Pump 1 and 2 switches if both are used The ON light above each switch turns...

Page 22: ...encomplete PUSH TO START CYCLE START Clean out After running a cycle or if the seed type changes run a clean out of the Inlet Hopper and the Mixing Bowl Step 1 Turn OFF the Liquid Pump 1 and Liquid Pu...

Page 23: ...Pumps 1 2 MUST be turned OFF in order to operate the Bowl Discharge switch refer to Step 1 previous page End of Manual Step 2 Hold the WEIGHT DISCHARGE switch in the ON position to empty the Inlet Hop...

Page 24: ...Shakopee MN 5379 USA Telephone 1 952 445 6868 Toll free 1 855 363 3152 Visit us on www seedgrowth bayer com BayerTM the Bayer CrossTM and Bayer SeedGrowthTM are registered trademarks of Bayer SGRCBTB...

Reviews: