27
INSTRUCTIONS FOR FITTERS
911.848.4 - en
STORAGE BOILER
6.2 CONNECTING THE STORAGE BOILER PROBE
6.3 CONNECTING THE STORAGE BOILER PUMP
6.4 CONNECTING THE BOILER PUMP
•
Pull up the cover of the storage boiler and remove
•
Use the supplied two-pin cable to connect the terminals (T1 and T2) of the 6-pin connector to the 2-pin terminal block
of the storage boiler (Figure 4).
(only for models SLIM iN - FiN)
Connect the system pump to the boiler using the methods described in the relative section of the boiler manual. (5.3 iN
- 5.2 FiN)
•
Connect the storage boiler pump to the terminals (L1 – N –
) of the 6-pin connecter using a “HAR VV – F” 3 x 0,75
mm 2 harmonised cable (Figure 4).
Close the covers of the 6-pin connector.
Figure 4. Connecting the DHW probe and the storage boiler pump
SB - STORAGE BOILER PROBE
UB - STORAGE BOILER
PS -STORAGE BOILER PUMP
ALSO SEE FIGURE 3
CT_0584_T / 1002_1
104