INSTALLER INSTRUCTIONS
CONTENTS
1
DESCRIPTION OF THE BOILER
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . pag. 46
2
INSTALLATION
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . pag. 47
3
CHARACTERISTICS
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . pag. 51
4
USE AND MAINTENANCE
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . pag. 53
IMPORTANT
When carrying out commissioning of the boiler, you are highly recommended to perform the
following checks:
– Make sure that there are no liquids or inflammable materials in the immediate vicinity of
the boiler.
– Make sure that the electrical connections have been made correctly and that the earth
wire is connected to a good earthing system.
– Open the gas tap and check the soundness of the connections, including that of the burner.
– Make sure that the boiler is set for operation for the type of gas supplied.
– Check that the flue pipe for the outlet of the products of the combustion is unobstructed.
– Make sure that any shutoff valves are open.
– Make sure that the system is charged with water and is thoroughly vented.
– Purge the system, bleeding off the air present in the gas pipe by operating the pressu-
re relief valve on the gas valve inlet.
CHARACTERISTICS OF THE SYSTEM SAFETY VALVE: calibration pressure: 4 bar; maxi-
mum generator power: 205.8 Kw, 1/2” x 3/4” fixtures (see Caleffi catalogue, code
527440).
SLIM
HPS - EN
GLISH
Summary of Contents for Slim HPS 1.110
Page 1: ...IT RUS FR ENG ...
Page 59: ......