9 Commissioning
9.1
General
The system is commissioned to enable it to be used for the first time, after
it has been out of service for a prolonged period or after any circumstance
requiring a full reinstallation of the system.
Commissioning the system enables the user to check the various settings
and perform the necessary checks to start up the system in complete
safety.
9.2
Checklist before commissioning
1. Check that the installation and the system are filled with heat transfer
fluid and have been bled correctly.
2. Check the tightness of the pipe connections.
3. Bleed the system if necessary.
4. Check the pressure shown on the unit's pressure gauge.
5. Check the electrical connections.
6. Check that there is an earth connection and the corresponding earth
connection circuit.
9.3
Commissioning procedure for SH 7 Compact
9.3.1
Settings
Once the filling procedure is complete, the system must be connected to
the power supply.
Although the system is configured in the factory, if the control is reset, the
first time that the control is switched on, the initialisation phase begins and
the commissioning menu launches automatically.
The commissioning menu guides the user through the key adjustment
parameters required to operate the system.
Importante
All the settings made during commissioning can be changed later
if necessary, via the corresponding parameter. Additional
functions and options can also be enabled and adjusted.
Language
Select the language required.
Time
Set the clock.
Fig.28
Language
ES
IDIO
SET
BA-0
0
0
0
0
5
7
-0
1
Fig.29
Time
O7:OO
HORA
SET
BA-0
0
0
0
0
5
8
-0
1