
7690785.01 (1-05/18)
34
I
N
S
T
A
L
L
E
R
S
e
c
t
i
o
n
(
e
n
)
TERMINAL BLOCK M3
Terminal 1-2
: (230Vac - max 1A) power supply of modulating boiler pump (PWM)
Terminal 2-3
: (max 1A) power supply of non-modulating boiler pump (ON - OFF)
Terminal 4
: not used
Terminal 5-6
: PWM signal of the modulating pump
Terminal 7-8
: not used
Terminal 9 - 10
: Domestic Hot Water tank pump
Terminal 11 - 12
: Heating System pump (device connected downstream of the hydraulic separator)
,IWKHDSSOLDQFHLVFRQQHFWHGWRDQXQGHUÀRRUV\VWHPLQVWDOODOLPLWWKHUPRVWDWWRSUHYHQWWKHODWWHUIURPRYHUKHDWLQJ
8VHWKHUHODWLYHFDEOHJURPPHWVDWWKHERWWRPRIWKHERLOHUWRWKUHDGWKHFDEOHVWKURXJKWRWKHWHUPLQDOEORFNV
$ 9DF9DF UHOD\ ZLWK D PLQLPXP FXUUHQW UDWLQJ RI $ DQG DEOH WR ZLWKVWDQG D VWDUWLQJ FXUUHQW RI DERYH $ LV
UHTXLUHGWRFRQQHFWWKHH[WHUQDOSXPSV
11.1 CONNECTING THE ROOM THERMOSTAT
7KH FRQQHFWLRQV LQ WHUPLQDO EORFN 0 DUH KLJK YROWDJH 9 %HIRUH PDNLQJ FRQQHFWLRQV PDNH VXUH WKH DSSOLDQFH LV
GLVFRQQHFWHGIURPWKHSRZHUVXSSO\5HVSHFWSRODULW\//,9(11(875$/
To connect the Room Thermostat to the boiler, proceed as described below:
•
6ZLWFKRIIWKHERLOHU
• Access the terminal block
M1
• Remove the jumper from the ends of contacts
1-2
and connect the wires
RIWKHYROWIUHH5RRP7KHUPRVWDW
• Switch on the boiler and make sure the Room Thermostat works correctly.
11.2 ACCESSORIES NOT INCLUDED IN THE SUPPLY
11.2.1 REMOTE CONTROL
7KHZLUHIURPWKHERLOHUWHUPLQDOEORFN0SRZHUVWKHGLVSOD\EDFNOLJKWLQJ9,WLVQRWQHFHVVDU\WRFRQQHFWWKLVZLUHWR
PDNHWKH5HPRWH&RQWUROZRUN
To operate the boiler with the Remote Control mounted on the wall, purchase accessory
A
supplied with the base
A1
. Also see
the mounting and operation instructions supplied with the kit
A
. Proceed as follows:
• Switch off the boiler.
• Pass the three wires from the boiler terminal block
M2
through the hole in the base
A1
to apply to the wall.
• Connect wires
1-2-3
of the boiler terminal block
M2
to terminals
(1)-(2)-(3)
of the base terminal block
A1
respectively.
• Fix the base
A1
to the wall using the expansion grips and screws supplied with the accessory.
• Apply the Control Panel
A
WRWKHEDVH¿[HGWRWKHZDOOWDNLQJFDUHQRWWRDSSO\H[FHVVLYHIRUFH
• Power the boiler making sure that the Remote Control lights up.
A1
A
A - A1
A
A1
A1
A
B
B1
B
B1
A
Control Panel
A1
Base for wall-mounted Control Panel
B
Led interface accessory
B1
Base for Led interface accessory
(1)
Display backli12V
(2)
Earth connection
(3)
Power input/12V
Min. 200 mm
1500mm
Summary of Contents for LUNA DUO-TEC MP+ 1.115
Page 27: ...7690785 01 1 05 18 96 S E C T I O N B 7685789...
Page 29: ...7690785 01 1 05 18 98 S E C T I O N C...
Page 31: ...7690785 01 1 05 18 100 S E C T I O N D 25 mm...
Page 34: ...103 S E C T I O N F 7690785 01 1 05 18 AGU 2 550 CR_0349 CR_0349 AVS 75 bis...
Page 35: ...7690785 01 1 05 18 104 S E C T I O N F CG_2482 Tmax 50 C...
Page 37: ...7690785 01 1 05 18 106...
Page 38: ...107 7690785 01 1 05 18...
Page 39: ...7690785 01 1 05 18 DVVDQR GHO UDSSD 9 7 9LD 7UR HWWL 6HUYL LR FOLHQWL WHO 7HOHID ZZZ ED L LW...