Baxi Duo-tec Combi HE LPG User Operating Instructions Manual Download Page 9

Supplied By www.heating spares.co  Tel. 0161 620 6677

6.0 Legislation

9

© Baxi Heating UK Ltd 2010

6.1

Installation, Commissioning, Service & Repair

1. This appliance must be install in accordance with the
manufacturer’s instructions and the regulations in force. Read
the instructions fully before installing or using the appliance.

2. In GB, this must be carried out by a competent person as
stated in the Gas Safety (Installation & Use) Regulations.

3. 

Definition of competence:

A person who works for a Gas

Safe registered company and holding current certificates in the
relevant ACS modules, is deemed competent.

4. In IE (Eire), this must be carried out by a competent person
as stated in I.S. 813 “Domestic Gas Installations”.

All Gas Safe registered engineers carry an ID card with their
licence number and a photograph. You can check your
engineer is registered by telephoning 0800 408 5500 or online
at www.GasSafeRegister.co.uk

The boiler meets the requirements of Statutory Instrument
“The Boiler (Efficiency) Regulations 1993 No 3083” and is
deemed to meet the requirements of Directive 92/42/EEC on
the energy efficiency requirements for new hot water boilers
fired with liquid or gaseous fuels:-

Type test for purpose of Regulation 5 certified by:
Notified Body 0085.

Product/Production certified by:
Notified Bodies 0086.

For GB/IE only.

6.2 

Benchmark Commissioning Checklist

1. Please ensure that the installer has fully completed the
Benchmark Checklist on the inside back pages of the
installation instructions supplied with the product and that you
have signed it to say that you have received a full and clear
explanation of its operation. The installer is legally required to
complete a commissioning checklist as a means of complying
with the appropriate Building Regulations (England and Wales).

2. All installations must be notified to Local Area Building
Control either directly or through a Competent Persons
Scheme. A Building Regulations Compliance Certificate will
then be issued to the customer who should, on receipt, write
the Notification Number on the Benchmark Checklist.

3. This product should be serviced regularly to optimise its
safety, efficiency and performance. The service engineer should
complete the relevant Service Record on the Benchmark
Checklist after each service.

4. The Benchmark Checklist may be required in the event of
any warranty work and as supporting documentation relating
to home improvements in the optional documents section of
the Home Information Pack.

Summary of Contents for Duo-tec Combi HE LPG

Page 1: ...g UK Ltd 2010 Duo tec Combi HE LPG Range Gas Fired Wall Mounted Condensing Combination Boiler Please keep these instructions in a safe place If you move house please hand them over to the next occupie...

Page 2: ...a copyright work may be liable to criminal prosecution and civil claims for damages 1 0 Quick Reference Guide 3 2 0 Troubleshooting 4 3 0 Repressurising System 6 4 0 Clearances 7 5 0 Care of the Boile...

Page 3: ...en the boiler is in the central heating mode Domestic Hot Water Indicator The indicator will illuminate when hot water is being supplied to a tap or shower Burner On Indicator The indicator will illum...

Page 4: ...to the boiler is switched on Is the display lit Display Central Heating Indicator Domestic Hot Water Indicator Burner On Indicator Boiler operating satisfactorily bar 0 1 2 3 4 Is the Central Heating...

Page 5: ...imer Is the Room Thermostat if fitted set high enough 15 10 5 20 2 5 15 10 5 20 2 5 Turn Room Thermostat to maximum setting typical example shown If you don t know what you need to do to get the boile...

Page 6: ...ear to the boiler 3 If you are unsure of its position or cannot identify it consult the installer who fitted the boiler 4 The filling loop consists of two taps and a separate copper pipe with connecti...

Page 7: ...r 6 Your boiler should have the following minimum clearances for Safety and Maintenance Figs 3 4 Top 200mm Bottom 150mm Left side 5mm Right Side 5mm Front 5mm In Operation 450mm For Servicing This is...

Page 8: ...is shown as E then 50 3 E20 E28 E50 E125 E160 indicate faulty components You should make a note of the displayed error code and contact your installer or service engineer 4 If E110 or E130 is display...

Page 9: ...boilers fired with liquid or gaseous fuels Type test for purpose of Regulation 5 certified by Notified Body 0085 Product Production certified by Notified Bodies 0086 For GB IE only 6 2 Benchmark Commi...

Page 10: ...Supplied By www heating spares co Tel 0161 620 6677 7 0 Notes 10 Baxi Heating UK Ltd 2010...

Page 11: ...lves are positioned under the boiler and can be closed by turning their taps to the right towards the wall Fig 6 3 Call your Installer or Service Engineer as soon as possible Warning IMPORTANT This bo...

Page 12: ...u should always contact your installer first because the cause of the fault may not be related to the boiler If your installer confirms that the fault is with the boiler and he she can t repair it our...

Reviews: