5.0 Dimensions and Fixings
12
© Baxi Heating UK Limited 2005
Key To Support Bracket
1
Domestic Hot Water Outlet
4
Central Heating Flow
2
Cold Water Inlet
5
Central Heating Return
3
Gas Supply
6
Pressure Relief
Support Bracket
1
2
3
4
5
63 mm
62 mm
77 mm
74.5 mm
Tap Rail
Top View
of Tap Rail
C/L
6
50 mm
360° Orientation
Tube Ø 110mm
D
C
B
A
E
F
3°
(1 in 20)
DIMENSIONS
A
850mm
B
320mm
C
490mm
D
125mm Ø Min.
E
150mm
F
136mm
SIDE FLUE (left and right)
For every 1m of horizontal flue
length, the clearance above the top
of the flue elbow should be 55mm
to incorporate the 3°
(1 in 20) fall in the flue from the
terminal to the elbow.
The 3° (1 in 20) fall provided by
the elbow is to allow condensate
to run back to the boiler, for
disposal through the condensate
discharge pipe.
Flue length (Y)
up to 1m
1m - 2m
2m - 3m
Clearance (X)
55mm
110mm
165mm
Y
3°
(1 in 20)
X