![Baxi 45 HTE Installation, Operation And Maintenance Manual Download Page 133](http://html.mh-extra.com/html/baxi/45-hte/45-hte_installation-operation-and-maintenance-manual_2711664133.webp)
65
912.359.1 - IE
IstructIons pErtaInIng to thE InstallEr
0502_2108
Figure 12a
LEGEND:
Pi:
Gas supply pressure
connection point
P out: Pressure connection point for
measurement of the OFFSET
V:
Gas flow adjuster screw
K:
OFFSET adjuster screw
13. adjusting the gas valves
0502_2109
Figure 12b
HTE boiler models 85 and 100 have a single gas valve (figure 12 a).
HTE boiler models 120 and 150 have a double gas valve (figure 12 b).
gas nozzle
gas nozzle
mixer
gas manifold