5 PRE-INSTALLATION PREPARATION
5.1 Unpacking.
The carton contains the following:-
1off
Fire assembly.
1off
Ceramic fuel effect (In packaging inside firebox).
1off
Closure plate.
1off
Smoke match tube.
1off
Olive & olive nut for gas line connection
1off
Literature pack
Remove all the items carefully to prevent damage. Some items may be contained in the
packaging fitments -Examine the packaging carefully before discarding. Check that all
the items are present and undamaged.
5.2 Fireplace flue pull.
Close all doors and windows in the room in which the appliance is to be installed. After
confirming with a match that smoke is drawn into the flue, light a 13 gram smoke pellet
and check that there is a definite flow through the
flue. Verify outside that the smoke exits from one
terminal only and that the termination is suitable.
Observe, where possible, upstairs rooms and loft
spaces for signs of escaping smoke indicating a
defective flue. If there is not a definite flow warm
the flue for a few minutes and repeat the smoke
pellet test. If there is still no definite flow the flue
may need remedial work –
Do not fit the appliance
until there is a definite flow through the flue.
5.3 Appliance preparation.
5.3.1.
Stand the fire upright.
5.3.2
Remove two transit screws from the
upper back panel (See figure 4).
5.3.3.
Remove the control knob by pulling
clear of the gas tap spindle.
5.3.4.
Remove the control bezel by unscrewing
two screws (See figure 5).
5.3.5.
Detach the fascia by removing the
screws at the sides (See figure 5).
Spring the bottom corners of the fascia
outward and pull the bottom of the fascia
forward to clear the fixing brackets. Lift the
Page 15
INSTALLER GUIDE
©
Baxi Heating U.K. Limited 2007.
Figure 5. Fascia removal.
Figure 4. Transit screws.