
3-9
3. Placing into operation
EMERGENCY OFF
z
Press EMERGENCY OFF pushbutton switch (11).
z
The instrument returns to the operating condition „READY FOR
OPERATION“.
The high voltage transformer will be isolated from the supply
voltage.
the indicator lamp „In Operation“ of pushbutton switch (3)
is out
the red indicator lamp (7) is out
the green indicator lamp (8) is illuminated
z
The instrument can only be placed in the operating condition
„READY FOR SWITCHING ON“ by pressing the push-
button switch (2) „Ready for switching on“ if the EMERGENCY
OFF pushbutton switch (11) has been unlocked with the key.
By pressing the EMERGENCY OFF pushbutton switch and taking
out the key, unauthorized use of the instrument can be prevented.
☞
Summary of Contents for SSG 500
Page 2: ...0 2 ...
Page 6: ...0 6 Notes Notes ...
Page 12: ...1 6 1 Product Information Notes ...
Page 14: ...2 Packing and Shipping 2 2 Notes ...
Page 24: ...3 10 3 Placing into operation Notes ...
Page 28: ...4 Servicing Maintenance 4 4 Notes ...
Page 32: ...5 Options Accessories and Ordering Information 5 4 Notes ...