
3. Placing into operation
3-4
Connection of instrument
Observe correct position of connection terminals!
(also see Note on page 3-5)
Connection to a single-phase shielded cable
Connection of a three-phase shielded cable
Connection to a three-phase unshielded cable with neutral
1.
Rear view of device
2. High voltage connection cable
3. Protective ground cable
4. High voltage connection cable conductor
5. High voltage connection cable screen
6.
Station ground
- Protective ground connection
- Operating ground connection
Pulse current flow
Summary of Contents for SSG 500
Page 2: ...0 2 ...
Page 6: ...0 6 Notes Notes ...
Page 12: ...1 6 1 Product Information Notes ...
Page 14: ...2 Packing and Shipping 2 2 Notes ...
Page 24: ...3 10 3 Placing into operation Notes ...
Page 28: ...4 Servicing Maintenance 4 4 Notes ...
Page 32: ...5 Options Accessories and Ordering Information 5 4 Notes ...