
0-3
© BAUR Prüf- und Messtechnik GmbH, A-6832-Sulz / Austria
All rights reserved.
No part of this publication may be reproduced, transmitted, stored
in a data processing system or translated into another language
without the written permission of BAUR / Sulz, Austria.
In the interest of our customers we reserve the rights for
modifications due to technical progress.
Illustrations, descriptions and delivery content are therefore not
binding.
For fast finding of important information the corresponding text
passages are marked with symbols (symbols not stated here are
self-explaining):
More and special information concerning the respective subject are
available from BAUR.
Important unit information!
In any case, read carefully!
Important information text.
Observe info signs!
☞
Guide to this Operating Instruction
Copyright
© Copyright by BAUR
Subject to modification!
This manual contains all information necessary for the correct
handling and use of the PGK 25 High Voltage Testing Set. Before
using the PGK 25, please read carefully this Operating Instruction.
If you have any question, please contact directly:
Preface
BAUR Prüf- und Messtechnik GmbH, Raiffeisenstrasse 8
A-6832 Sulz / Austria
or refer to your nearest BAUR representative.
Phone +43 / 55 22 / 49 41-0
Fax +43 / 55 22 / 49 41 3
Safety Precautions
Please read now
and avoid damage
and injury later!
- The PGK 25 High Voltage Testing Set is built in accordance
with today’s state of engineering and is safe to operate.
Individual components and the finished unit are inspected
continually by our qualified staff within the framework of our
Quality Assurance Provisions. Each unit is subjected to
thorough testing prior to shipment.
Guide to this Operating Instruction, Copyright, Preface, Safety Precautions
Continued
Summary of Contents for PGK 25
Page 2: ...0 2 ...
Page 6: ...0 6 Notes ...
Page 8: ...1 2 1 Operating Elements 1 2 Notes ...
Page 10: ...2 Packing and Shipping Notes 2 2 ...
Page 12: ...3 Power supply Power selection 3 2 Notes ...
Page 20: ...5 Guard Connection 5 6 Notes ...
Page 23: ...7 Insulation resistance chart 7 1 7 Insulation resistance chart ...