
5. Guard Connection
5-5
☞
Insulation test of a H.V. insulator. Under this test, the surface
currents of the insulator will be ignored.
Measurement of surface currents. Insulation leakage currents
which are flowing to the housing will be ignored during this test.
Very small surface currents can be measured.
The test lead may not be interrupted during testing, otherwise
the test lead could carry high voltage!
Housing
Contact ring
Insulator
Station earth
Guard
Housing
Contact ring
Insulator
Station earth
Guard
Summary of Contents for PGK 25
Page 2: ...0 2 ...
Page 6: ...0 6 Notes ...
Page 8: ...1 2 1 Operating Elements 1 2 Notes ...
Page 10: ...2 Packing and Shipping Notes 2 2 ...
Page 12: ...3 Power supply Power selection 3 2 Notes ...
Page 20: ...5 Guard Connection 5 6 Notes ...
Page 23: ...7 Insulation resistance chart 7 1 7 Insulation resistance chart ...