Installation
46
Mono Power Unit BUM 62, 63, 64
5.94005.12
Baumüller Nürnberg GmbH
5.6.3 Control terminal
y
Sub-unit terminal X99A/X99B
Due to the connection of X99A to the X99B of the next BUS-device in the chain, the system can execute
the signals as a bus connection.
Recommended connection length 44 mm
WARNING
All the control voltages connected from outside must be PELV or SELV.
Terminal no.
Assignment
1, 2
+ 24 V (PELV)
Terminal for power supply to the units,
both terminals internally connected,
2nd terminal with power supply current > 10 A
3, 4
Ground 24 V (PELV)
Terminal for power supply to the units,
both terminals internally connected,
2nd terminal with power supply current > 10 A
5
BB int (PELV)
Ready for use signal form the supply converter to all units
connected to the DC link
6
Reserved (message ballast) (PELV)
if no ballast unit is used the terminal 6 must be connected
with terminal 1 or 2 (+24 V)
Summary of Contents for BUM 62
Page 1: ...E 5 94005 12 Manual Mono Power Unit BUM 62 63 64 ...
Page 8: ...Safety Notes 8 Mono Power Unit BUM 62 63 64 5 94005 12 Baumüller Nürnberg GmbH ...
Page 16: ...Transportation Unpacking 16 Mono Power Unit BUM 62 63 64 5 94005 12 Baumüller Nürnberg GmbH ...
Page 28: ...Installation 28 Mono Power Unit BUM 62 63 64 5 94005 12 Baumüller Nürnberg GmbH ...
Page 62: ...Commissioning 62 Mono Power Unit BUM 62 63 64 5 94005 12 Baumüller Nürnberg GmbH ...
Page 66: ...Maintenance 66 Mono Power Unit BUM 62 63 64 5 94005 12 Baumüller Nürnberg GmbH ...
Page 73: ......