41
Instruction handbook
Safe STO logic
BM5-SSL
Document No. 5.18007.02
8
M
OUNTING
AND
I
NSTALLATION
This chapter describes the mechanical mounting and the electrical installation
.
The mounting and installation process consists of the following steps:
1
Mount the
BM5-SSL
.
2
Connect the
BM5-SSL
with e. g. b maXX 5800 and safety components (for example,
emergency stop device, electromechanical safety component, ...).
3
Check the assembly and installation by means of the „Installation checklist“ listed in
Appendix
8.1
General safety regulations
CAUTION!
The „Installation checklist“ shown in Appendix
on page 71 should be used
during the assembly and installation phase.
m
Make sure that the installation process is carried out entirely in accordance with
the installation and wiring plan.
m
Conduct a visual inspection and check all system components for visible damage.
m
Check the system for wiring errors.
m
Inspect the tightening torque and make sure that the electrical connection is not
interrupted by insulation material.
m
Inspect the tensile-load capacity of the electrical terminal and screw connections.
m
Make sure that the installation and cable routing are carried out in accordance with
applicable standards and guidelines.
m
Make sure that the system's environmental properties specified in
on page 24 are not exceeded.
m
Make sure that the design of the system's type of protection is sufficient.
m
Make sure that the safety system is not damaged by moving parts or work in the
area surrounding the installed safety components.
m
Make sure that the system components do not come into contact with aggressive
substances (such as acids, bases, transmission oil).
Summary of Contents for BM5-SSL
Page 79: ......