![Baumatic BAEC2SS.2 User Manual Download Page 13](http://html1.mh-extra.com/html/baumatic/baec2ss-2/baec2ss-2_user-manual_2709579013.webp)
o
Restart the machine using the power ON/OFF switch (20).
o
You must start the drinks making process right from the
beginning, as stated in the “Using your espresso maker” section
(pages 15 – 17).
3) Getting started (Loading the system with water)
IMPORTANT: YOU MUST FOLLOW THE STEPS BELOW
BEFORE HEATING THE WATER BOILER FOR THE
FIRST TIME.
o
Place a jug below the pipe (for boiling water and steam) (17).
o
Push the boiling water dispensing button (33).
o
Allow the appliance to have a constant flow of water running
through the system for a few seconds.
o
Press the boiling water dispensing button (33) again to stop the
flow of water from the pipe.
Using your espresso maker
IMPORTANT: Please note that the main boiler and
the steam boiler CANNOT be operated at the same
time.
1) Dispensing hot water through the main boiler
o
Follow the instructions on filling the water reservoir as stated
previously and proceed as follows:-
o
Press the main boiler activation button (29) to allow the boiler
to heat up. During this process, the main boiler status indicator
(23) will flash.
o
When the boiler has reached its operating temperature, the main
boiler status indicator (23) will stop flashing and remain steady.
o
Place a cup underneath the filter holder ring nut (19) and then
press the main boiler dispensing button (30).
o
To stop hot water from dispensing, press the same button again.
13
Summary of Contents for BAEC2SS.2
Page 2: ...2 2...