^
WARNING
Moving parts can crush and cut�
Keep clear of moving components�
Follow lockout procedure before
servicing�
1.
Park cutter on a level surface.
2.
Lower cutter to the ground.
3.
Shut off engine, remove key and lockout
control panel.
4. Remove cutting blades. See Section 5.1.
5. Remove socket head screws (A).
6. Remove mounting plate (B) and blade carrier
(C).
A
B
C
7. Install blade carrier (C), mounting platre (B)
and socket head scrwws (A).
8.
Tighten nscrews (A) to 339 lb-ft (469 Nm) of
torque.
Note:
Parts breakdown can be found on
Baumalight’s website
. www.baumalight.com
5�2 Replace Blade Carrier
5�2 Check Gearbox Oil
^
WARNING
Moving parts can crush and cut�
Keep clear of moving components�
Follow lockout procedure before
servicing�
1.
Park cutter on a level surface.
2.
Lower cutter to the ground.
3.
Shut off engine, remove key and lockout
control panel.
4. Remove cover (A).
A
13