
21
4.3.2.3 Operation of measurements display
1. UPS measurements can be checked after UPS started by pressing select key
. The display sequence are as below figure-F (AC input voltage)
figure-G
(AC input frequency)
figure-H (UPS output voltage)
figure-I (UPS output
frequency)
figure-J (UPS loading percentage)
figure-K (UPS output
current)
figure-L (Battery voltage)
figure-M (UPS inner temperature) and back
to figure-F.
F
G
H
I