background image

REMEMBER 

to place Cover Plate over the 

tube before making the electrical connection.

*Drill holes at the 3 mounting points chosen.
*Drill 4mm pilot holes. Open up with 8mm drill.

*Choose mounting points according to particular model
*CHECK that chosen points are correct using assembled HTR.

3c. Mounting: 

Drill Holes

3d. Mounting: 

Secure Male Mounts

3e. Mounting: 

Connect Electrical Wiring

 

 

1.    DANGER- Electricity is dangerous.
2.    Electrical connection must be done by a registered electrician/wireman in 
          accordance with the relevant Wiring Code.
3.    HTRs are deemed to be fixed appliances and therefore are required to have either:

       a.   

an Isolator Switch installed within arms distance of the heated towel rail.

       b.   

be connected to a circuit breaker that can be locked in the open position.

4.    The HTR must be connected to a circuit with Earth Leakage Protection.

5.    Check product rating label voltage and make sure correct voltage is supplied at 
       electrical point.

Ceramic Tile

Masonry Wall

Ø8mm

(not supplied)

Pilot hole - 

Ø4mm

(not supplied)

Sizing hole - 

Ø8mm

(not supplied)

*CAUTION:

Before drilling check
for water pipes

(not supplied)

(not supplied)

X 3

X 3

Summary of Contents for LOFT TWIN 6 Bar

Page 1: ... an EARTH LEAKAGE protected circuit 9 Before attempting any maintenance of the HTR ensure that the power is disconnected switched off at the point of isolation 10 Check product rating label voltage and make sure correct voltage is supplied at electrical point CAUTION States a hazard which may pose minor injury and or product damage if installation instructions are not followed 1 HOT Surfaces avoid...

Page 2: ...m Power Cable To be used for VISIBLE wiring Mounting TUBE A Button Head Screw M4 x 6mm Plastic Wall Plug 8mm Male Mount II PH2 Countersunk Head Screw 5 0x50mm Grub Screw M5 x 6mm Female Mount Mounting TUBE C PH2 Countersunk Head Screw M6 x 70mm Mounting C Qty 3 Standard Mount Wall fasteners suitable for installation to masonry wall Wall fasteners suitable for installation to masonry wall ...

Page 3: ...2 Assembly 2a Assembly Fit MOUNTING A Mounting C Mounting A Mounting C ...

Page 4: ...2b Assembly Fit MOUNTING C As supplied X 3 X 3 ...

Page 5: ...ate Vertical OR FOR RIGHT HAND Mounting Not Possible Cut out Electrical Outlet hole and place template on wall by positioning over the Wall Plate Bracket Secure template in place with masking tape i Attach direct to wall For 6mm Wall Plug drill 4mm Pilot hole then open hole with 6mm Drill E O E l e c t r i c al Outlet St a r t h e r e Cut o u t ...

Page 6: ...tered electrician wireman in accordance with the relevant Wiring Code 3 HTRs are deemed to be fixed appliances and therefore are required to have either a an Isolator Switch installed within arms distance of the heated towel rail b be connected to a circuit breaker that can be locked in the open position 4 The HTR must be connected to a circuit with Earth Leakage Protection 5 Check product rating ...

Page 7: ...o decrease the temperature turn the dial to the left To switch off keep turning the dial to the left until you hear an audible click When the HTR is on the PTSelect Switch is illuminated by a red light This red light flashes depending upon the heat level chosen The longer the red light glows the warmer the heated towel rail will be Bathroom Butler HTRs are offered with 2 different Controller optio...

Page 8: ...leaving the HTR switched on permanently uses unnecessary electricity because in most cases your towels will be completely dry within 4 hours of being hung depending upon humidity levels and how wet your towel was originally Bathroom Butler uses Dry Element Technology DET and thanks to the benefit of Rapid Heating which allows the unit to heat up to working temperature within a mere 10 to 15minutes...

Reviews: