![Batco 1314LP Operator'S Manual Download Page 57](http://html1.mh-extra.com/html/batco/1314lp/1314lp_operators-manual_2708139057.webp)
P1512120 R3
57
Figure 27.
Diagonal Pattern for 4-bolt and 6-bolt Tires
1
2
3
4
1
2
3
6
4
5
6.21. Inspect and Service the Hand Winch and Lift Cable
Æ
When equipped:
Place conveyor in fully lowered position with cable slack.
1. Inspect the cable for damage such as fraying, kinking, or unwinding. Replace if damaged (see below).
2. Check to make sure cable clamps are secure.
3. Oil cable pulleys as needed.
4. Keep a film of grease on the gears. Occasionally oil the bushings, drum shaft, and ratchet.
5. Do not get oil or grease on brake discs.
6. Replace brake discs if less than 1/16" (1.6 mm) thick.
7. Check for proper ratchet pawl operation:
•
When cranking in (clockwise) = loud clicking
•
When cranking out (counterclockwise) = no clicking and ratchet pawl fully engaged into gear teeth.
To Replace the Lift Cable:
1. Unwind the winch drum until cable is slack and remove all cable clamps.
2. Remove the cable.
3. Reverse the above steps to install the new cable.
6.22. Pinion Gear Adjustment
Æ
When Equipped:
PORTABLE GRAIN BELT CONVEYOR – S-DRIVE FIELD LOADER
6. MAINTENANCE