![Batco 1300 P Series Operation Manual Download Page 21](http://html1.mh-extra.com/html/batco/1300-p-series/1300-p-series_operation-manual_2708138021.webp)
BATCO - T
OP
D
RIVE
F
IELD
L
OADER
5. P
LACEMENT
1300 P, 1500 P S
ERIES
5.1. U
NDER
H
OPPER
B
OTTOM
B
INS
P1512121
19
5. Placement
5.1. UNDER HOPPER BOTTOM BINS
B
EFORE
MOVING
CONVEYOR
UNDERNEATH
HOPPER
BIN
:
1. Confirm
that
hopper is centered between the hopper bin vertical legs. This
ensures that the operator has adequate clearance.
2. Collapse the cloth hopper until it is positioned under the bin.
3. Move conveyor into place, raise the conveyor spout to desired height.
4. Ensure that the winch is locked or ball valve is shut for hydraulic winch.
5. Make sure that gravel is not jammed against the belt under the hopper.
5.2. FILLING TRUCKS/TANKS
1. Back the machine up to the storage facility while it is in its lowered configu-
ration. Use jack to aid adjustment.
2. Set the park brake on the tractor before dismounting.
3. When releasing conveyor from the towing vehicle, test the intake end for
downward weight.
4. Use the winch to raise the machine so it clears the container.
a. Disconnect hydraulic hose and close ball valve.
b. Remove the hitch from the machine to prevent interfering with other
equipment.
5. Slowly back the machine up until the outlet is under the opening in the
storage facility.
Warning:
Before continuing, please reread the safety information relevant to this section at
the beginning of this manual. Failure to follow the safety instructions can result in serious
injury, death, or property damage.
WARNING
Set the park brake on the tractor before
dismounting.