![Baso BG1600M Installation Instructions Manual Download Page 4](http://html1.mh-extra.com/html/baso/bg1600m/bg1600m_installation-instructions-manual_2707568004.webp)
4
BG1600M Intermittent Pilot Ignition Control with Rollout Switch Installation Instructions
Typical Wiring Chart
TO
TO
Label
(REF)
TB
#
TB
SPADE
TB
#
TB
Label
GND
(VALVE)
5/Chassis
(frame)
Connect To
1
GND
(MV/PV)
GND
(BURNER)
5/Chassis
(frame)
Connect To
2
GND
(BURNER)
GND
(24V)
5/Chassis
(frame)
Connect To
3
GND
(24V)
THS
2
Connect To
4
24V / TH
PV
1
Connect To
5
PV
MV
3
Connect To
6
MV
R.O. SWH
R1
Connect To
7
R.O. SW
SENSE
4
Connect To
8
SENSE
NC
none
NC
none
9
INTERN
SPARK
Rajah
Connect To
10
SPARK
NOTE: NC means No Connection
BG1600M01CR-1BD
G775 RJD-2
G775 RJD-14
G775 RJD-15
JCI (Johnson Controls) To BASO Intermittent Pilot Ignition (IPI) Control
with Rollout Switch
G77xRJx Series to BG1600M0 Series with Remote Sense
and R.O. Switch
BASO (IPI)
G775 RJD-13C
JCI (IPI)
G775 RJD-1
G770 RJA-1C
BG1600M00ER-1BD
TO