5-2
BE1-50/51B-214/-215/-223/-225 Testing
9252000994 Rev N
Figure 5-1. Pickup and Timing Test Setup, BE1-50/51B-214/-225
Figure 5-2. Target Operational Test Setup, BE1-50/51B-214/-225
BE1-50/51B-214/-225
6
5
3
1
TIME
INST
2
CURRENT
SOURCE
INPUT
STOP
TIMER
START
AMPS
TEST SET
P0059-08
BE1-50/51B-214/-225
6
5
CURRENT
SOURCE
INPUT
STOP
TIMER
START
AMPS
TEST SET
2
3
INST
1
TIME
P0059-09
R
AC or DC
Voltage
Source
(V)
1 A Target Current
R = V/1
Rwatts = 1*V
Summary of Contents for BE1-50/51B-214
Page 2: ......
Page 6: ...iv BE1 50 51B 214 215 223 225 Introduction 9252000994 Rev N This page intentionally left blank...
Page 8: ...vi BE1 50 51B 214 215 223 225 Introduction 9252000994 Rev N This page intentionally left blank...
Page 34: ...ii BE1 50 51B 214 215 223 225 Installation 9252000994 Rev N This page intentionally left blank...
Page 42: ...ii BE1 50 51B 214 215 223 225 Testing 9252000994 Rev N This page intentionally left blank...
Page 52: ...5 10 BE1 50 51B 214 215 223 225 Testing 9252000994 Rev N This page intentionally left blank...
Page 69: ......