4-2
BE1-50/51B-214/-215/-223/-225 Installation
9252000994 Rev N
From the reset characteristic curve equation.
1
M
RD
T
2
Reset
−
=
seconds
15.5
1
0
2
7.75
2
−
=
−
×
=
M = 0 if current goes to zero.
Negative result indicates reset time.
Results: Full trip = 0.209 seconds and full reset = 15.5 seconds if current goes to zero.
T
A
= 0.209 seconds (relay was at reset).
T
B
= value < T
A
because rewind has not gone to zero.
T
C
= value < T
A
because rewind has not gone to zero.
Figure 4-1. Coordination Timing Diagram
Equation for time to trip during rewind (before relay is reset).
(
)(
)
Rewind
Full
Time
Rewind
Trip
Full
T
Occurence
This
Trip
=
Second Operation
(
)( )
15.5
3
0.209
T
B
=
seconds
0.040
T
B
=
Third Operation
(
)(
)
15.5
11.96
0.209
T
C
=
seconds
0.161
T
C
=
Summary of Contents for BE1-50/51B-214
Page 2: ......
Page 6: ...iv BE1 50 51B 214 215 223 225 Introduction 9252000994 Rev N This page intentionally left blank...
Page 8: ...vi BE1 50 51B 214 215 223 225 Introduction 9252000994 Rev N This page intentionally left blank...
Page 34: ...ii BE1 50 51B 214 215 223 225 Installation 9252000994 Rev N This page intentionally left blank...
Page 42: ...ii BE1 50 51B 214 215 223 225 Testing 9252000994 Rev N This page intentionally left blank...
Page 52: ...5 10 BE1 50 51B 214 215 223 225 Testing 9252000994 Rev N This page intentionally left blank...
Page 69: ......