Design Guide for Hazardous / Industrial
Self-regulating trace heating systems
21-5400-7D0001/-
05/2023-EHT-466854
Notice Technical data subject to change without notice.
No claims for damage arising from alternations, errors or misprints shall be allowed.
Page 32 / 40
At first, install fixing straps around the beginning and end of the tank and fasten them with slight tension.
Upright tank
Horizontal tank
Install the trace heater beginning at the supply point.
Fix it at the distances specified in the project planning documentation. Use the pre-mounted fixing straps to hold the trace heaters in place.
Allow for material addition for the bases.
19
18