Installation
1. Loosen all (4) ceiling bracket wing nuts half way for ease of installation. Hang the fixture on the ceiling T-bars using the
ceiling brackets. (Fig. 1)
2. Tighten all ceiling bracket wing nuts to secure the fixture in place. Adjust the slot placement of the ceiling brackets
accordingly to adjust the enclosure opening to be level with the inside surface of the T-bar. (Fig. 2a, b)
a. Additional chains or cabling shall be used for enclosure securement.
3. Remove the (4) #6-32 x 3/4” flat head screws from cover. (Fig. 3)
4. Remove the cover and connect the lanyards to the lanyard hooks found inside the enclosure. (Fig. 4a, b)
5. Connect flexible conduit to one of the three available conduit knockouts. (Fig. 5)
Wing
Nuts
Ceiling
Bracket
Fig. 1
Fig. 2b
Fig. 2a
6-32 x 3/4”
Flat Head
Screws
Fig. 3
Fig. 4a
Fig. 4b
Lanyard
Hook
Lanyard
Flexible
Conduit
Fig. 5
10070166
R
EV 7 - 08/22
2
800-533-3948 www.barronltg.com
CRL Series
Installation Instructions