IP33 – Mezzanine Gate © Copyright 2016
www.barriergroup.com.au
MEZZANINE GATE
Installation Procedure
Optional U-Bars
When side in-fills are
required, optional surface
mount U-Bars are available
in a range of standard size
UBD100SM-G,
UBD150SM-G,
UBD200SM-G
Optional Reinforment Plate
When mounting posts on timber
or unsupported floors, the optional
reinforment plate provides
additional support to the post.
WARNING
The gate will not provide optimum performance unless it is installed correctly. For
satisfactory gate operation please follow the instructions carefully.
NOTE:
No guarantee will be given or responsibility accepted by the manufacturers if the gate
is not installed as instructed. Barrier Group
do not
warrant the work of 3rd party contractors.
BEFORE YOU START
1. The installer must ensure the desired mounting point for the gate is level, plumb and rigid.
2. Use fixings appropriate to the material into which they are being fixed (not included).
3. Check all parts are included. Contact Barrier Group immediately if you are missing a piece.
AFTER INSTALLATION CARE
Barrier Group recommends that you check the operation of your gate at least every six
months (more regularly in extreme environments or frequent use). It is natural for spring
assistance unit to lose tension over time. Adjustment may be required.
Important information.
Read carefully.
Keep this information for further reference.