9
Visually check for any physical damage to the shipping
container. Inspect the equipment surfaces that are adja-
cent to any damaged area. Open the furnace door and re-
move packing material from inside the furnace chamber.
Vacuum the chamber prior to use to remove the insulation
dust due to shipping.
The furnace is supplied with two hearth plates. Place the
hearth plates on the bottom of the chamber.
Install ceramic sleeve into top vent hole on furnace case.
Retain the original packaging material if re-shipment is
foreseen or required.
Unpacking
Summary of Contents for F62730
Page 42: ...42 Wiring Diagrams Single Setpoint w OTP Control SW1172X1 SW1172X1 SW1172X1 SW1172X1...
Page 43: ...43 WIRING DIAGRAMS 8 Segment Programmable Control SW1172X1 SW1172X1 SW1172X1...
Page 49: ...49 TITLE RIGHT...
Page 50: ...50...
Page 51: ...51...
Page 53: ......
Page 54: ......
Page 55: ......
Page 56: ......
Page 57: ......
Page 58: ......
Page 59: ......
Page 60: ......
Page 61: ......
Page 62: ......
Page 63: ......
Page 64: ......
Page 65: ......
Page 66: ......
Page 67: ......
Page 68: ......
Page 69: ......
Page 70: ......
Page 71: ......
Page 72: ......
Page 73: ......
Page 74: ......
Page 75: ......
Page 76: ......
Page 77: ......
Page 78: ......
Page 79: ......
Page 80: ......