41
g.
Loosen top adjustment bracket and remove de-
fective muffle.
h.
Insert new muffle with vent hole facing the top of
unit.
i.
Readjust top bracket to fit snugly up against
muffle. Make sure muffle is laying flush against
front case section.
j.
Reinstall metal retaining band and tighten until
muffle seats firmly into case section.
k.
Reconnect element lead wires.
On the 120V or 100V muffle there are three element
lead wires. Connect the front and the back element lead
wires to the mechanical relay. Connect the middle ele-
ment lead wire to the solid state relay.
On the 230V and 240V muffles there are two element
lead wires. Connect the front element lead wire to the
mechanical relay. Connect the back element lead wire to
the solid state relay.
l.
Reinstall the thermocouple and the retaining
clip.
m.
Reinstall the cover section.
n.
Set the furnace upright and test the operation of
the furnace.
M
AINTENANCE AND
S
ERVICING
Note
Make sure the black insulation sleev-
ing covers the exposed portion of the
element lead wires.
Note
Make sure the exposed section of the
T/C lead wires are not contacting each
other.
Summary of Contents for F62730
Page 42: ...42 Wiring Diagrams Single Setpoint w OTP Control SW1172X1 SW1172X1 SW1172X1 SW1172X1...
Page 43: ...43 WIRING DIAGRAMS 8 Segment Programmable Control SW1172X1 SW1172X1 SW1172X1...
Page 49: ...49 TITLE RIGHT...
Page 50: ...50...
Page 51: ...51...
Page 53: ......
Page 54: ......
Page 55: ......
Page 56: ......
Page 57: ......
Page 58: ......
Page 59: ......
Page 60: ......
Page 61: ......
Page 62: ......
Page 63: ......
Page 64: ......
Page 65: ......
Page 66: ......
Page 67: ......
Page 68: ......
Page 69: ......
Page 70: ......
Page 71: ......
Page 72: ......
Page 73: ......
Page 74: ......
Page 75: ......
Page 76: ......
Page 77: ......
Page 78: ......
Page 79: ......
Page 80: ......