Figure A. Typical Polypropylene Tubing Connector Installation

Operation

Initial Operation

 

NOTE

Because of the fragile nature of the macroreticular resin used in the D0835 and D0836
Pretreatment Cartridges, it is possible that shipment may have caused fracturing of some of
the resin particles. Resin fracturing will not degrade cartridge performance. However, it may
reduce system performance as evidenced by premature clogging of the Final Filter. To insure
optimum system performance and to prevent premature filter clogging, it is recommended
that the D0835 and D0836 Pretreatment Cartridge be rinsed to remove any fine particles.
Install only the Pretreatment Cartridge in the first canister and run water to drain for ten
minutes.

Install the cartridges as follows:
(Refer to TABLE 2 for correct left to right cartridge sequence.)

A. Remove the protective plastic bag from the cartridges.
B. Install D0835 or D0836 pretreatment cartridge into canister #1. Ensure the small hole is on the top and

the larger hole is on the bottom.

 

NOTE

Check to be sure O-rings are in place in the canister and inside the head and are not damaged
prior to installation. Do not install the remaining cartridges and final filter at this time.

C. Install the canister, including cartridge on head #1 (closest to pump cabinet).

Figure B. Cannister Locking Pin Positioning

Summary of Contents for D4631 120 VAC

Page 1: ..._____________________ Barnstead Barnstead Thermolyne Corporation BARNSTEAD E pure OPERATION MANUAL AND PARTS LIST SERIES 582 3 Module E pure 4 Module E pure D4631 120 VAC D4641 120 VAC D4632 240 VAC D...

Page 2: ...ector Installation 8 Figure A Typical Polypropylene Tubing Connector Installation 9 Operation 9 Initial Operation 9 Figure B Cannister Locking Pin Positioning 9 Filling Procedure 11 Normal Operation 1...

Page 3: ...rical service according to local and national electrical codes Failure to properly connect may create a fire or shock hazard 3 Do not mount E pure directly over equipment that requires electrical serv...

Page 4: ...z 1 3 lpm 1 E pure will produce Type I water using pretreated water RO DI Distilled or high quality tap water provided feedwater suitability is qualified by laboratory analysis and recommended faucet...

Page 5: ...cy Nominal 100 VAC 50 60 Hz 85 110 VAC 47 63 Hz 1 phase 115 VAC 50 60 Hz 98 127 VAC 47 63 Hz 1 phase 230 VAC 50 60 Hz 196 253 VAC 47 63 Hz 1 phase Protection 100 VAC service 3 ampere slow blow fuse 11...

Page 6: ...it is typically used with water pretreated by reverse osmosis distillation or deionization If you plan to use a tap water feed for your E pure Barnstead encourages the use of our water analysis servic...

Page 7: ...ondition and construction as well as fastener type must be considered when mounting this unit The mounting surface and fasteners selected must be capable of supporting a minimum of 145 pounds Inadequa...

Page 8: ...dapter will create damage and subsequent leakage NOTE It is recommended that the customer supply a feedwater shut off valve to interrupt water to the unit when cartridge replacement is necessary G Sec...

Page 9: ...he D0835 and D0836 Pretreatment Cartridge be rinsed to remove any fine particles Install only the Pretreatment Cartridge in the first canister and run water to drain for ten minutes Install the cartri...

Page 10: ...alve I Remove the empty canisters drain the water and install the remaining cartridges per Table 2 NOTE The correct sequence of cartridges is important in producing the desired quality of water J Open...

Page 11: ...ng CAUTION Do not tighten filter with a wrench Tight connections can be made by hand H Allow the pump to recirculate water before withdrawing any water from the unit During this recirculation the digi...

Page 12: ...king days when there is an unacceptable high bacteria passage or when flow decreases to less than 1 liter per minute To replace the final filter follow instructions on page 11 Step G Always run at lea...

Page 13: ...ter from the unit Do not attempt to sanitize final filter with chemical solutions H If an external pressure switch or pump protector is used disconnect from the receptacle on the left side of the pump...

Page 14: ...in a mild detergent solution and or a 10 inorganic acid solution follow manufacturers recommended handling procedure This may be done in an ultrasonic cleaner or with a soft brush The cell must be th...

Page 15: ...tch is installed in the feedwater line the pump will not start until the line pressure rises to 0 35 kg cm2 5 psi Open the feedwater line shutoff valve or fill the feedwater reservoir If no pump prote...

Page 16: ...ristics If a Barnstead ROpure is the feedwater source check that the membrane is functioning properly If a Barnstead Still is the feedwater source ensure that the distillate temperature to the E pure...

Page 17: ...pter 03039 3 Plug FS550X1 4 Nipple PM550X2 5 Pump 100 VAC 120 VAC PU582X1A 240 VAC PU582X2A 6 Fuse 100 VAC 120 VAC FZX15 2 Required Fuse 240 VAC 04420 2 Required 7 Fuse holder FZX26 8 Switch ON OFF SW...

Page 18: ...18 Figure D Exploded View E pure...

Page 19: ...ridge seal GSX27 5 Valve 02273 6 Elbow 05766 7 Block BK582X2 8 Nipple PM582X1 9 Adapter BR550X2 10 Head BK550X2 11 Fastener pins FP550X1 12 Connector head to head BR550X4 13 O ring head to head 06440...

Page 20: ...or provides information on life expectancy from which the USER may calculate a replacement interval compatible with your usage pattern The replacement of consumable parts is discussed in the Maintena...

Page 21: ...BR550X2 1 1 Valve 02273 1 1 Check Valve 02214 1 1 Safety Stock Safety Stock For critical applications where performance with MINIMUM downtime is required Barnstead Thermolyne recommends that the USER...

Page 22: ...ly to defects in original parts or components and does not apply to claims or alleged product failures resulting from unauthorized repairs misuse accidents or lack of proper maintenance failure to fol...