11
OPTIONAL COOLING COIL:
Connect 3/8" (9.5mm) ID tubing to the ports marked "IN", "OUT" and
"DRAIN". Run tubing from the "IN" port to the coolant circulation and from the
"OUT" port to the coolant reservoir. Condensation from the incubator chamber
will drain from the port marked "DRAIN.” Run tubing from this port to a floor
drain or container.
OPTIONAL GASSING MANIFOLD:
For older style shakers, use the following instructions:
Connect 1/4" (6.4mm) ID tubing to the gas inlet port on the right side of
the unit, near the rear. Connect the other end of the tubing to the flow regulator
on the gas tank. Use only noncorrosive, nonflammable inert gases. Connect
1/4" (6.4mm) ID tubing to eight hose barbs inside the chamber along the back.
Run the tubing into the vessels.
Gassing manifolds for new style shakers are installed as follows:
?
Securely fasten the manifold to the cover with the furnished 8-32 x 5/8
tapping screws, #8 flat washers, #8 lock washers and #8-32 hex kep nuts.
?
Attach flexible tubing to the barbed fitting on the manifold and, allowing
sufficient length for movement, cut and attach tubing to the gas source
regulator.
OPTIONAL LIGHT BANK:
Unpack the light bank carefully. Note that the supports and hardware
are separate from the main unit. Install the 4 supports at the corners of the
light bank with the Phillips screws supplied. The light bank will stand on the 4
supports.
Plug Model 4628-40 into a 120 VAC, 60 Hz grounded outlet and turn the
light switch to
ON
. Model 4628-41 plugs into a 240 VAC, 50 Hz grounded outlet.
If the fluorescent tubes do not light, remove the screen tabs to open the screen,
then turn the tubes in their fixtures. The tubes may have loosened during
shipping. If the tubes still do not light, contact your Lab-Line dealer to
resolve the problem.
Artisan Technology Group - Quality Instrumentation ... Guaranteed | (888) 88-SOURCE | www.artisantg.com