10
INSTALLATION
SHIPPING CARTON:
This should be inspected upon delivery. When received, carefully
examine for any shipping damage before unpacking. If damage is discovered,
the delivering carrier should both
specify and sign for the damage on your
copy of the delivery receipt.
Open the carton carefully making certain that all parts are accounted for
before packaging materials are discarded—after unpacking, if damage is found
promptly report it to the carrier and request a damage inspection promptly.
IMPORTANT: Failure to request an inspection of damage within a few
days after receipt of shipment absolves the carrier from any liability for damage:
you must call for a damage inspection promptly.
CAUTION:
DO NOT MODIFY CONSTRUCTION AND/OR ASSEMBLY OF
INCUBATOR-SHAKER. DO NOT REMOVE LABELS, DECALS OR OTHER
INFORMATION FROM THE INCUBATOR-SHAKER.
LOCATION:
Place the shaker on a level surface in an area which is free of drafts,
wide variations in ambient temperature and extraneous vibrations.
ELECTRICAL REQUIREMENTS:
120 VAC models require a 120 VAC, 50/60 Hz power source. They are
supplied with a 3-wire line cord. It should be plugged into an outlet
designed for 3-prong plugs. If an extension cord is used, it also should be
the 3-wire grounded type. For an outlet designed to accept 2-prong plugs
(ungrounded), it is
required that a qualified electrician replace the outlet with a new grounded type.
240 VAC models require a 240 VAC, 50/60 Hz power source. Because of
the variety of plug configurations in use worldwide for 240 VAC power, the unit is
furnished with the plug removed. The user must install a plug to conform with
local code and configuration requirements.
100 VAC models require a 100 VAC, 50/60 Hz power source. Because of
the variety of plug configurations in use worldwide for 100 VAC power, the unit is
furnished with the plug removed. The user must install a plug to conform with
local code and configuration requirements.
If a plug must be installed, use only the 3-prong grounded type, rated for
the unit load requirements and matching the power outlet. Make sure the green
ground wire is secured to the plug ground terminal.
NOTE:
LEAVE UNIT DISCONNECTED WHEN NOT IN USE.
PLATFORM INSTALLATION:
Select the platform that accommodates the vessels to be shaken. Attach
the platform on the shaking plate by inserting and tightening the 4 button-head
screws using an Allen key or knurled thumb-screws depending on platform being
used. Make sure that all 4 sides of the platform are outside the shaking plate.
CAUTION:
DO NOT PLACE PLATFORM MOUNTING SCREWS IN SHAKING
PLATE CORNERS WITHOUT FIRST INSTALLING PLATFORM. SERIOUS
DAMAGE MAY RESULT OTHERWISE.
INSTALLATION:
(Con’t)
Artisan Technology Group - Quality Instrumentation ... Guaranteed | (888) 88-SOURCE | www.artisantg.com