background image

8

Elbow Tubing Installation

6.

Connect the remaining tubing to the
plumbing service connection marked
“drain” and extend the tubing into the
sink to allow the holder to be drained in
an unrestricted manner.

Elbow-Tubing Assembly

Assembling the tubing and polypropylene elbow
is accomplished as follows to ensure against
leakage.

1.

Remove the adapter nut, being careful
not to lose the o-ring, backup ring, and
stainless steel grab ring.

2.

Remove the o-ring from the elbow.

3.

Install the metal grab ring and backup
ring in the adapter nut, and install the
nut on the elbow. Do not install the
o-ring at this time.

4.

Push the tubing through the nut until it
bottoms out in the elbow.

5.

Remove the adapter nut, then install the
o-ring on the tubing. Do not push the
backup or metal grab rings back on the
tubing when installing the o-ring on the
tubing.

6.

Install the adapter nut on the elbow and
hand-tighten the nut.

I

NSTALLATION

Caution
Do not restrict the tubing and run
the tubing in an upward direction
from the top of the unit. Any
restriction on the outlet can result in
a cartridge bursting and flooding.

Caution
Do not apply a wrench to the nut—
the nut should be hand-tightened
only to prevent leakage.

Summary of Contents for 494 Series

Page 1: ...1 Type D0800 Bantam Cartridge Holder OPERATION MANUAL AND PARTS LIST SERIES 494 BARNSTEAD THERMOLYNE CORPORATION 60119 3 12 98 Model Voltage D0800 120 D0805 240...

Page 2: ...trapure Mixed Resin 5 Installation 6 Unpacking 6 Choosing a Site 6 Mounting 6 Plumbing Service Connections 6 Elbow Tubing Assembly 8 Cartridge Installation 9 Operation 10 Purity Meter Operation 10 Mai...

Page 3: ...ughout the manual Warnings To avoid electrical shock always 1 Use a properly grounded electrical outlet of correct voltage and current handling capacity 2 Disconnect from the power supply prior to mai...

Page 4: ...i u q e r l a c i r t c e l E 0 0 8 0 D l e d o M 1 z H 0 6 0 5 V 0 2 1 e s a h p 2 z H 0 6 0 5 V 0 2 1 e s a h p 1 2 5 0 8 0 D 1 z H 0 6 0 5 V 0 4 2 e s a h p 2 z H 0 6 0 5 V 0 4 2 e s a h p 1 2 Note...

Page 5: ...the cartridge is new Ultrapure Mixed Resin This cartridge catalog no D0809 has the capacity to remove 65 grams 750 grains of dissolved ionized impurities as NaCl About 3 4 75 of the capacity is capabl...

Page 6: ...Mounting The Bantam Holder is shipped assembled for bench mounting Four screws are provided for wall mounting if desired Plumbing Service Connections The Bantam Holders are supplied with polypropylen...

Page 7: ...drain on the Bantam Holder to the sink and to make the plumbing service connection between the holder effluent connection at the top of the unit and the point of distribution 4 Thread the 1 8 NPT x 1...

Page 8: ...nd backup ring in the adapter nut and install the nut on the elbow Do not install the o ring at this time 4 Push the tubing through the nut until it bottoms out in the elbow 5 Remove the adapter nut t...

Page 9: ...wn to allow the cartridge to be centered between the top and bottom o ring 3 Turn the lower tightening wheel until the cartridge seats against the top o ring INSTALLATION Note Water purified by the io...

Page 10: ...ing Meter by setting the on off switch to the on position When the purity meter drops below the acceptable minimum purity or when the purity meter needle registers in the 0 05 to 0 025 megohm red rang...

Page 11: ...er needle is aligned with the line indicating the beginning of the meter scale The zero adjustment screw is located on the face of the meter below the scales 3 To calibrate the meter further connect a...

Page 12: ...12 Exploded View...

Page 13: ...x D O 4 1 s s a r b e v l a V 7 V 5 1 1 8 3 5 1 2 V 0 3 2 9 1 0 3 3 r e t e M 8 7 9 5 5 1 r e d l o h e g d i r t r a C 9 6 9 8 5 1 e l p p i N 0 1 2 0 5 5 1 l e e h W g n i n e t h g i T r e w o L 1...

Page 14: ...whom you purchased this unit or can be obtained promptly from the factory When service or replacement parts are needed we ask that you check first with your dealer If the dealer cannot handle your re...

Page 15: ...15...

Page 16: ...ng and contamination must be returned to our factory and if upon inspection it is concluded that failure is not due to excessive high temperature or contamination warranty replacement will be provided...

Reviews: