Barnes 4SE-EDS Series Installation And Operation Manual Download Page 3

Please Read This Before Installing Or Operating Pump. This
information is provided for 

SAFETY and to PREVENT EQUIPMENT

PROBLEMS.

 To help recognize this information, observe the

following symbols:

IMPORTANT!

 Warns about hazards that can result in

personal injury or Indicates factors concerned with
assembly, installation, operation, or maintenance which

could result in damage to the machine or equipment if ignored.

CAUTION !

   Warns about hazards that 

can or will cause minor

personal injury or property damage if ignored. Used with symbols
below.

WARNING ! 

  Warns about hazards that 

can or will cause serious

personal injury, death, or major property damage if ignored. Used
with symbols below.

 

Only qualified personnel should install, operate and repair pump. Any
wiring of pumps should be performed by a qualified electrician.

   WARNING !

 To reduce risk of electrical shock, pumps and

  control panels must be properly grounded in accordance
  with the National Electric Code (NEC) or the Canadian
  Electrical Code (CEC) and all applicable state, province,
  local codes and ordinances. Improper grounding voids
  warranty

  

WARNING !

 To reduce risk of electrical shock, always

  disconnect the pump from the power source before
  handling or servicing. Lock out power and tag.

 

WARNING !

 Operation aga inst a closed

discharge valve will cause premature bearing
and seal failure on any pump, and on end suction

and self priming pump the heat build may cause the generation of
steam with resulting dangerous pressures. It is recommended that
a high case temperature switch or pressure relief valve be installed
on the pump body.

  

CAUTION !

  Never operate a pump with a plug-in 

  type power cord without a ground fault 
  circuit interrupter.

  

CAUTION ! 

Pumps build up heat and pressure

  during operation-allow time for pumps to cool
  before handling or servicing.

  

WARNING !

  Do not pump hazardous materials

  (flammable, caustic, etc.) unless the pump is
  specifically designed and designated to handle them.

  

CAUTION !

 Do not block or restrict discharge hose,

  as discharge hose may whip under pressure.

  

WARNING !

 Do not wear loose clothing that may 

  become entangled in moving parts.

 

  WARNING ! 

Keep clear of suction and discharge

  openings. DO NOT insert fingers in pump with
  power connected.

 

 

  Always wear eye protection when working on pumps.

  Make sure lifting handles are securely fastened each 
  time before lifting. 

DO NOT

 operate pump without safety

  devices in place. Always replace safety devices that 
  have been removed during service or repair. Secure the
  pump in its operating position so it can not tip over, fall 
  or slide.

  DO NOT

 exceed manufacturers recommendation for

  maximum performance, as this could cause the motor 
  to overheat.

  

DO NOT

 remove cord and strain relief. 

DO NOT 

connect

  conduit to pump.

  

WARNING !

 Cable should be protected at all times to 

  avoid punctures, cut, bruises and abrasions. Inspect
  frequently. Never handle connected power cords with 
  wet hands.

  

WARNING !

  To reduce risk of electrical shock, all 

  wiring and junction connections should be made per 
  the NEC or CEC and applicable state or province and 
  local codes. Requirements may vary depending on 
  usage and location.

  

WARNING !

  Submersible Pumps are not approved for 

  use in swimming pools, recreational water installations
  decorative fountains or any installation where human
  contact with the pumped fluid is common.

  

 WARNING !

  Products returned must be cleaned,

   sanitized, or decontaminated as necessary prior to
   shipment, to insure that employees will not be exposed to
   health hazards in handling said material. All Applicable
   Laws And Regulations Shall Apply.

   Bronze/brass and bronze/brass fitted pumps may contain
   lead levels higher than considered safe for potable water
   systems. Various government agencies have determined
   that leaded copper alloys should not be used in 
   potable water applications. For non-leaded copper 
   alloy materials of construction, please contact factory.

  BARNES® Pumps, Inc.  is not responsible for losses, injury,
 or death resulting from a failure to observe these safety
  precautions, misuse or abuse of pumps or equipment.

SAFETY  FIRST!

Hazardous fluids

 can

cause fire or explosions,
burns or death could result.

Extremely hot

 -

Severe burns can
occur on contact.

Eye protection
required

Hazardous voltage

 can

shock, burn or cause
death.

Toxic Fumes

 -

Breathing can cause 
nausea, fainting or death.

Hazardous pressure

Eruptions or explosions
could cause personal 
injury or property damage

Biohazard

 can cause 

serious personal injury.

Rotating machinery 

 Amputation or severe 
 laceration can result.

3

Summary of Contents for 4SE-EDS Series

Page 1: ...product changes may occur As such Crane Pumps Systems Inc reserves the right to change product without prior written notification SERIES 4SE EL 1 5 6 7HP 1750 RPM SERIES 4SE EDS 1 5 6 7HP 1750 RPM BA...

Page 2: ...CROSS SECTION Fig 21 22 4SE EDS EXPLODED VIEW Fig 22 23 4SE EDS PARTS LIST 24 25 4SE EDS LEAK SENSOR PARTS LIST 26 4SE EDS LEAK SENSOR EXPLODED VIEW Fig 23 27 START UP REPORT WARRANTY INFORMATION WARR...

Page 3: ...arge openings DO NOT insert fingers in pump with power connected Always wear eye protection when working on pumps Make sure lifting handles are securely fastened each time before lifting DO NOT operat...

Page 4: ...Phase NEMA B Three Phase Torque Curve Completely Oil Filled Squirrel Cage Induction Insulation Class A SINGLE PHASE Dual Voltage 200 230 Includes Overload Protection In Motor 1 5 2 2HP Capacitor Start...

Page 5: ...e Completely Oil Filled Squirrel Cage Induction Insulation Class A SINGLE PHASE Dual Voltage 200 230 Includes Overload Protection In Motor 1 5 2 2HP Capacitor Start 2 7 4 5HP Capacitor Start Capacitor...

Page 6: ...ly If it is required that the pump be installed and tested before the long term storage begins such installation will be allowed provided 1 The pump is not installed under water for more than one 1 mo...

Page 7: ...or cools to a safe temperature In the event of an overload the source of this condition should be determined and rectified immediately DO NOT LET THE PUMP CYCLE OR RUN IF AN OVERLOAD CONDITION OCCURS...

Page 8: ...Resistance 5 Start wires Black White Main wires Black Red Pump rated for operation at 10 Voltage at Motor MODEL NO A DIM HP VOLT PH NEMA START CODE FULL LOAD AMPS LOCKED ROTOR AMPS CORD SIZE CORD TYP...

Page 9: ...hould be taken to an authorized service station However as with any mechanical piece of equipment a preventive maintenance program is recommended and suggested to include the following checks 1 Inspec...

Page 10: ...rated in cooler temperatures COOLING OIL Dielectric TABLE 1 SUPPLIER GRADE BP Enerpar SE100 CONOCO Pale Paraffin 22 MOBIL D T E Oil Light G G OIL Circulating 22 Imperial Oil Voltesso 35 Shell Canada T...

Page 11: ...Fig 4 DIAPHRAGM PLUG Material 2 000 Dia Aluminum Fig 5 DIAPHRAGM CLAMP Material 750W x 375Thk Steel Fig 6 OIL FILLING 11...

Page 12: ...e stationary member is in straight Lightly oil shaft and inner surface of bellows on rotating member With lapped surface of rotating member facing inward toward stationary member slide rotating member...

Page 13: ...with hole in drive and bell Press housing in place and temporarily install two mounting bolts 67 Place several drops of oil inside of bellows of rotating member 13C and spread it over bellows Coat se...

Page 14: ...Y PRESSING ON INNER RACE Support rotor assembly on ring see Figure 13 when installing top bearing so that the pressing force is not transmitted through balls of drive end bearing Place Tetraseal 43 on...

Page 15: ...Fig 15 SINGLE PHASE 1 5HP 2 2HP Fig 16 SINGLE PHASE 2 7HP 4 5HP Fig 17 THREE PHASE 15...

Page 16: ...cord 83 to each electrode with screws at top of electrode holder 90 See Figure 18 After the leak sensor has been reassembled with all screws and threaded hardware thoroughly tightened it must be check...

Page 17: ...lean impeller cavity and inlet of any obstruction 9 Loosen union slightly to allow trappedair to escape Verify that turn off level of switch is set so that impeller cavity is always flooded Clean vent...

Page 18: ...Fig 19 SERIES 4SE EL 18...

Page 19: ...Fig 20 SERIES 4SE EL 19...

Page 20: ...2 Pipe Plug Hex Hd 1 8 Brass 017363 13 1 Shaft Seal C CE B 4023 14 8 Hex Hd Screw 1 4 20 x 1 00 Lg Stainless 1 7 1 15 16 Lock Washer 1 4 Stainless 20 13 1 16 2 RdHd Screw 10 32 x 375 Lg Stainless 2 8...

Page 21: ...460 3PH N4019 03 2 7HP 230 1PH N4019 09 2 7HP 230 460 3PH N4019 04 4 5HP 230 1PH N4019 10 4 5HP 230 460 3PH N4019 05 6 7HP 230 460 3PH N4019 11 48 1 Ball Bearing 039734 49 1 Ball Bearing 625 00719 50...

Page 22: ...SERIES 4SE EDS Fig 21 22...

Page 23: ...SERIES 4SE EDS Fig 22 23...

Page 24: ...Plug Hex Hd 1 8 Brass 017363 13 1 Dbl Mech Shaft Seal C CE B 007 00500 13A 1 Retainer 13B 1 Spring 13C 1 Seal Face 13D 1 Seal Seat 14 8 Hex Hd Screw 1 4 20 x 1 00 Lg Stainless 1 7 1 15 18 Lock Washer...

Page 25: ...ng Ring 625 00266 51 1 Shell 1 5 2 2HP 2 7HP 3PH 4005 01 2 7HP 1PH 4 5HP 6 7HP 4005 02 52 1 Stator 1 5HP 115V 1PH 625 00755 1 5HP 208 230 1PH 625 00753 1 5HP 208 230 3PH 625 00748 1 5HP 460 3PH 625 00...

Page 26: ...84 1 Thread Protector 4651 85 1 Packing Nut 3 4 16 4697 3 86 2 Flat Washer 007 00301 87 1 Grommet 007 00302 88 6 RdHd Screw 8 32 x 625 Lg Stainless 9 65 1 89 1 Top Cover 4690 102 90 1 Electrode Holde...

Page 27: ...SERIES 4SE EDS Fig 23 27...

Page 28: ...eld performance Any additional guarantees in the nature of performance specifications must be in writing and such writing must be signed by our authorized representative Due to inaccuracies in field t...

Page 29: ...ottom Does Impeller Turn Freely By Hand YES NO Condition Of Equipment GOOD FAIR POOR Condition Of Cable Jacket GOOD FAIR POOR Resistance of Cable Jacket GOOD FAIR POOR Resistance of Cable and Pump Mot...

Page 30: ...Pump Off L1 L2 L2 L3 L3 L1 Voltage supply at panel line connection Pump On L1 L2 L2 L3 L3 L1 Amperage Load connection Pump On L1 L2 L3 FINAL CHECK Is pump seated on discharge properly Check for leaks...

Page 31: ...Systems Inc Warranty Service Group IMPORTANT If you have a claim under the provision of the warranty contact your local Crane Pumps Systems Inc Distributor RETURNED GOODS RETURN OF MERCHANDISE REQUIRE...

Page 32: ...CRANE PUMPS SYSTEMS INC WARRANTY SERVICE GROUP 420 THIRD STREET P O BOX 603 PIQUA OHIO 45356 0603 U S A PLACE STAMP HERE FOLD HERE AND TAPE DO NOT STAPLE...

Reviews: