SECTION B: GENERAL INFORMATION
B-1) To the Purchaser:
Congratulations! You are the owner of one of the fi nest pumps
on the market today. CP&S pumps are products engineered
and manufactured of high quality components. Over one
hundred years of pump building experience along with a
continuing quality assurance program combine to produce a
pump which will stand up to the toughest applications. This
manual will provide helpful information concerning installation,
maintenance, and proper service guidelines.
B-2) Receiving:
Upon receiving the pump, it should be inspected for damage
or shortages. If damage has occurred, fi le a claim immediately
with the company that delivered the pump. If the manual
is removed from the packaging, do not lose or misplace.
B-3) Storage:
Short Term-
CP&S Pumps are manufactured for effi cient
performance following short inoperative periods in storage.
For best results, pumps can be retained in storage, as factory
assembled, in a dry atmosphere with constant temperatures
for up to six (6) months. Long Term- Any length of time
exceeding six (6) months, but not more than twenty-four (24)
months. The unit should be stored in a temperature controlled
area, a roofed over walled enclosure that provides protection
from the elements (rain, snow, wind-blown dust, etc.), and
whose temperature can be maintained b40 deg. F
and +120 deg. F. (4.4 - 49°C). Pump should be stored in its
original shipping container. On initial start up, rotate impeller
by hand to assure seal and impeller rotate freely. If it is
required that the pump be installed and tested before the long
term storage begins, such installation will be allowed provided:
1.) The pump is not installed under water for more than
one (1) month.
2.) Immediately upon satisfactory completion of the test,
the pump is removed, thoroughly dried, repacked in the
original shipping container, and placed in a temperature
controlled storage area.
B-4) Service Centers:
For the location of the nearest Barnes Service Center, check
your Barnes representative or Crane Pumps & Systems, Inc.,
Service Department in Piqua, Ohio, telephone (937) 778-8947
or Crane Pumps & Systems Canada, in Brampton, Ontario,
(905) 457-6223.
SECTION C: INSTALLATION
C-1) Location:
These pumping units are self-contained and are recommended
for use in a sump, lift station or basin. This pump is designed
to pump unscreened raw sewage, sludges, slurries, primary
and secondary tank de-slugging, storm overfl ow, wood pulp,
animal hide and fl eshings, vegetable waste, or other non-
explosive or non-corrosive applications and shall NOT be
installed in locations classifi ed as hazardous in accordance
with the National Electrical Code (NEC), ANSI/NFPA 70 or the
Canadian Electrical Code. Never install the pump in a trench,
ditch or hole with a dirt bottom; it will sink into the dirt and the
suction will become plugged.
C-1.1 Submergence:
It is recommended that the pump be operated in the
submerged condition and the sump liquid level should never
be less than dimension “A” in Figure 1.
C-2) Discharge:
Discharge piping should be as short as possible. Both a check
valve and a shut-off valve are recommended for each pump
being used. The check valve is used to prevent backfl ow into
the sump. Excessive backfl ow can cause fl ooding and/or
damage to the pump. The shut-off valve is used to stop
system fl ow during pump or check valve servicing.
Barnes Pumps supplies a breakaway fi tting discharge system
designed to allow the submersible cutter pump to be installed
or removed without requiring personnel to enter the wet well.
Place the Break Away Fitting (BAF) in position. Temporarily
secure the guide rails in the upper mounting brackets and
locate the base on the bottom of the wet well. Level the base
with grout and/or shims. Install the intermediate support
brackets, if required. Make sure the rails are in a true vertical
position so the pump will clear the access opening and
will slide freely down the rails into place on the discharge
stationary fi tting. Once the rails are in proper alignment, bolt
the base into the fl oor of the station and connect the discharge
pipe to the elbow. Connect the movable portion and other
supplied fi ttings of the BAF onto the pump and lower into wet
well. See the Break Away Fitting manual for more information.
C-3) Liquid Level Controls:
The level controls are to be supported by a mounting bracket
that is attached to the sump wall, cover or junction box. Cord
grips are used to hold the cords in place on the mounting
bracket. The control level can be changed by loosening
the grip and adjusting the cord length as per the plans and
specifi cations. Be certain that the level controls cannot
hang up or foul in it’s swing and that the pump is completely
submerged when the level control is in the “Off” mode.
FIGURE 1
Recommended
Submergence
Level
Minimum
Submergence
Level
A = 13”
Bottom
Summary of Contents for 4SCC Series
Page 15: ...15 FIGURE 9 Pump Series 4SCC 4SCD 4SCE 4SCF 100 132 Mtr Frame...
Page 18: ...18 FIGURE 10 Pump Series 4SCF 180 Mtr Frame...
Page 25: ...Notes...
Page 26: ...Notes...