The Company BARDIANI VALVOLE reserves the right to modify its products at any time without prior notice.
(GB-IST-B935-0413) 11/24
Wash and clean
thoroughly!
6. CLEANING OF DEPOSITS:
- Wash and clean all valve parts thoroughly before disassembly and assembly!
- Pay attention to possible deposits of cleaning agents and other aggressive fluids!
- Always use protective goggles and gloves, if necessary.
9. Planned Maintenance
7. REPLACING WORN VALVE PARTS:
- Always use original spare parts.
- See page 12 for spare parts ordering.
- Dispose of worn parts according to current directives.
Planned maintenance
Valve gaskets
Actuator gaskets
Preventive
Replace after 12 months
Replace after 24 months
In case of leakage
Replace at the end of the
day
Replace in case of leakage
Periodical
Check for correct ope-
ration and absence of
leakage
Check for correct operation and
absence of leakage
Record all actions taken
Record all actions taken
8. General Maintenance