![Bardiani Valvole BBZO BBZOG Instruction Manual Download Page 17](http://html1.mh-extra.com/html/bardiani-valvole/bbzo-bbzog/bbzo-bbzog_instruction-manual_474929017.webp)
11
2
1
33
100
1
191
17
24
(GB-IST-BBZO-0413) 17/24
The Company BARDIANI VALVOLE reserves the right to modify its products at any time without prior notice.
12. Assembly of BBZO / BBZOR
7.
Screw shutter (2) into cylinder. Counterhold pivot
with an allen wrench.
C
OUNTERHOLD!
Air
Air
8.
Fix the guide bushing (17) through 2 screw M6x10
and supply air to fitting (24).
9.
Insert the sealing ring (191) on the lower body (1).
Assemble the lower body (1) to the flange (100) using
the clamp (33).
10.
Release air pressure to air fitting (24) and remo
-
ve 2 M6x10 to allow assembly of the
Giotto-Top
®
.