Manual
2100-483E
Page
17 of 59
10. VENT TERMINAL AND COMBUSTION
AIR INLET HOOD
The vent terminal is shipped in the burner
compartment. See Figure 7. Remove the two shipping
screws and separate the two-piece assembly. Install the
vent terminal by using the four screws provided.
Make
sure gasket is in place
. See Figure 8. The combustion
air intake hood is factory installed.
11. OPTIONAL VERTICAL VENTING
With the optional vertical venting kit (VVK-5) this unit
may be vented vertically through a roof or overhang.
The kit includes a stainless steel transition drain tee,
silicone sealant, and drain tubing.
If unit is installed with vertical vent kit, annually
inspect the vent system and drain. Replace any portion
of the vent system that shows signs of deterioration.
Make sure drain is open and free of obstruction.
FIGURE 8
VENT TERMINAL AND COMBUSTION AIR INTAKE
CAUTION
Vent terminal must be installed as shown in Figure 8 for proper operation of the heating system.
NOTE: The inner vent hood gasket is designed to stretch over and seal around the combustion
air blower outlet. This is a very critical seal to prevent water and flue products from entering the
unit. Care must be taken to insure this gasket is in place and sealing properly.
Summary of Contents for WG3S1-A
Page 11: ...Manual 2100 483E Page 11 of 59 FIGURE 2A MOUNTING INSTRUCTIONS FOR WG3S1 ...
Page 12: ...Manual 2100 483E Page 12 of 59 FIGURE 2B MOUNTING INSTRUCTIONS FOR WG4S1 AND WG5S1 ...
Page 15: ...Manual 2100 483E Page 15 of 59 FIGURE 6 COMMON WALL MOUNTING INSTALLATIONS ...
Page 25: ...Manual 2100 483E Page 25 of 59 FIGURE 11 GAS PIPE CONNECTION ...