Manual 2100-538A
Page
11 of 23
FIGURE 5
WALL MOUNTING INSTRUCTIONS
FIGURE 6
WALL MOUNTING INSTRUCTIONS
DUCT
OPENING
RETURN AIR
SUPPLY AIR
WOOD FRAME WALL INSTALLATION
OPENING
WALL BEFORE
MOUNT ON UNIT
OPENING
BEFORE INSTALLATION
BOTTOM MOUNTING
CONCRETE BLOCK WALL INSTALLATION
BRACKET. MOUNT ON
OPENING
WOOD OR STEEL SIDING
OPENING
INSTALLING UNIT.
RETURN AIR
WALL STRUCTURE
RETURN AIR
SUPPLY AIR
FACTORY SUPPLIED
RAIN FLASHING.
SUPPLY AIR
MIS-548 A
SIDE VIEW
I
A
C
K
E + 1.000
B
1.000
I
A
C
K
E + 1.000
B
1.000
I
A
C
K
E + 1.000
B
1.000
I
A
C
K
E + 1.000
B
1.000
I
A
C
K
E + 1.000
B
1.000
I
A
C
K
E + 1.000
B
1.000
I
A
C
K
E + 1.000
B
1.000
I
A
C
K
E + 1.000
B
1.000
I
A
C
K
E + 1.000
B
1.000
I
A
C
K
E + 1.000
B
1.000
I
A
C
K
E + 1.000
B
1.000
I
A
C
K
E + 1.000
B
1.000
I
A
C
K
E + 1.000
B
1.000
I
A
C
K
E + 1.000
B
1.000
I
A
C
K
E + 1.000
B
1.000
I
A
C
K
E + 1.000
B
1.000
I
A
C
K
E + 1.000
B
1.000
RETURN DUCT
L
2 x 6
PLATE OF WALL
ATTACH TO BOTTOM
1.000" CLEARANCE
C
STRUCTURAL STEEL
OVER FRAME
2 x 4'S, 2 x 6'S &/OR
EXTERIOR FINISH WALL
OPENING
1.000" CLEARANCE
OPENING
SUPPLY DUCT
INTERIOR FINISHED WALL
ATTACH TO TOP
FRAMING MATERIAL
PLATE OF WALL
OVER FRAME
IF REQUIRED
THIS STRUCTURAL MEMBER
LOCATED TO MATCH STUD
SPACING FOR REST OF WALL.
A SECOND MEMBER MAY BE
REQUIRED FOR SOME WALLS.
IF REQUIRED
ALL AROUND DUCT
ALL AROUND DUCT
SEE UNIT DIMENSIONS, FIGURE 2,
FOR ACTUAL DIMENSIONS.
MIS-549 A
SEE FIGURES 3A & 3B – MOUNTING INSTRUCTIONS