background image

Manual 2100-752B 

Page 

20 of 49

Wiring – Main Power

Main electrical power must be supplied to the unit 
from a clean, reliable power source. Verify voltage being 
supplied to the unit is consistent during all times of the 
day and within the range specified for the unit in the 
unit specifications and on the unit serial plate. Voltage 
must be measured at the field power connection point 
in the unit and while the unit is operating at full load 
(maximum amperage operating condition).
Refer to the unit serial plate and unit specifications 
for wire sizing information and maximum fuse or 
circuit breaker size. Each outdoor unit is marked with 
a “Minimum Circuit Ampacity”. This means that the 
field wiring used must be sized to carry that amount 
of current. Depending on the installed KW of electric 
heat, there may be two field power circuits required. If 
this is the case, the unit serial plate will so indicate. 
All models are suitable only for connection with copper 
wire. Each unit and/or wiring diagram will be marked 
“Use Copper Conductors Only”. These instructions 
must be adhered to. Refer to the National Electrical 
Code (NEC) for complete current carrying capacity data 
on the various insulation grades of wiring material. All 
wiring must conform to NEC and all local codes. 

FIGURE 20

High Voltage Connections

The electrical data on the serial plate, in the unit 
specifications and also in Table 9 on page 37 list fuse 
and wire sizes (75°C copper) for all models including 
the most commonly used heater sizes. Also shown are 
the number of field power circuits required for the 
various models with heaters. The unit rating plate lists 
a “Maximum Time Delay Relay Fuse” or circuit breaker 
that is to be used with the equipment. The correct type 
and size must be used for proper circuit protection and 
also to ensure that there will be no nuisance tripping 
due to the momentary high starting current of the 
compressor motor.
Three phase models must have proper phasing. A phase 
monitor is included in all three phase models, and will 
indicate improper phasing during a call for cooling 
(24VAC at Y1 terminal). See provided information 
included in this document regarding the phase monitor.

High Voltage Connections

Field wires can enter the cabinet through either a top 
or side knock-out on the right. Both entrance points 
will utilize the wire channel to direct field wires to the 
control panel. Figure 20 shows the entrance points and 
wire routing.

MIS-4184

FIELD WIRE ENTRANCE

MIS-4184

CIRCUIT BREAKER

WIRE CHANNEL TO

ROUTE FIELD WIRES

INTO CONTROL PANEL

Summary of Contents for Q36A4DA

Page 1: ...kaged Air Conditioner Models INSTALLATION INSTRUCTIONS Q36A4DA Q36A4DB Q36A4DC Q42A4DA Q42A4DB Q42A4DC Bard Manufacturing Company Inc Bryan Ohio 43506 www bardhvac com Manual 2100 752B Supersedes 2100...

Page 2: ...e 27 Troubleshooting Compressor Logic CCM 27 High Pressure Switch 27 Low Pressure Switch 27 Freeze Stat Switch 27 Logic Control Board 28 Phase Monitor 28 Condenser Fan Operation 28 Sequence of Operati...

Page 3: ...re Resistance 44 Table 15 Dehumidification Relay Logic Board 49 FIGURES Figure 1 Air Seal Under Q TEC Unit 5 Figure 2 Removal of Q TEC Unit from Skid 5 Figure 3 Fan Assembly Removal 6 Figure 4 Q TEC U...

Page 4: ...RNING Heavy item hazard Use more than one person to handle unit Check unit wheels to ensure that wheels are locked before removing from skid Failure to do so could result in unit damage or serious inj...

Page 5: ...100 752B Page 5 of 49 FIGURE 1 Air Seal Under Q TEC Unit Hold Skid Down A Shipping Brackets B Front Wheels Over Edge C Front Wheels On Floor FIGURE 2 Removal of Q TEC Unit from Skid Air Seal MIS 1008...

Page 6: ...ct work For use without duct work Plenum Box QPB36 is recommended These instructions explain the recommended method to install the air cooled self contained unit and the electrical wiring connections...

Page 7: ...provides enough clearance to install the duct work see Figure 6 FIGURE 5 Installation with Duct Free Plenum 8 FT 5 IN 8 FT 6 IN MINIMUM REQUIRED INSTALLATION HEIGHT MIS 4174 FLOOR MIS 4174 FIGURE 6 Du...

Page 8: ...supply a Q4CX Cabinet Extension can be used to conceal the duct work above the unit to the ceiling This extends 20 above the unit for a total height above the floor of 10 7 8 The unit is equipped wit...

Page 9: ...located in the rear of the unit and to gain access to make these adjustments remove the air filter service door All capacity efficiency and cost of operation information as required for Department of...

Page 10: ...after the panel has been removed To gain access to the mist eliminator the QERV must be removed 1 The front fill plate of the QERV must be removed There is one screw on either side of the plate Remove...

Page 11: ...pieces to the wall This unit is to be secured to the wall sleeve with mounting brackets provided The unit itself the supply duct and the free blow plenum are suitable of 0 clearance to combustible mat...

Page 12: ...tom Trim Extension Mounting Bracket Side Trim 2 PCS Side Trim 2 PCS Cabinet Side Panel Enlarged view of mounting bracket showing sleeve to cabinet attachment Mounting Bracket 8 Screw Provided Light Co...

Page 13: ...gth to trim up to a 10 2 ceiling NOTE If the exterior wall thickness is between 5 and 10 5 a side trim extension piece kit model QSTX42 is available Condensate Drain There are two drain connections on...

Page 14: ...cal growth to occur by minimizing the standing water and exposing it to warm temperatures See Figures 18A 18B 18C and 18D on pages 15 18 The drain box permanently mounts onto the wall sleeve and is th...

Page 15: ...A MIS 2469 SUPPLIED WITH DRAIN BOX KIT 3 4 PLASTIC PIPE NIPPLE HORIZONTAL TO FLOOR TIGHTEN THREADS SO TEE IS THREADS APPLY TEFLON TAPE TO REAR DRAIN CONNECTION IN Q Tec PRODUCT 1 2 SLIP X 1 2 SLIP X 3...

Page 16: ...Manual 2100 752B Page 16 of 49 MIS 2471 A REMOVE KNOCK OUT FOR INDOOR DRAIN HOSE CONNECTOR FIGURE 18C If used...

Page 17: ...OVE HOSE FROM ATTACHMENT IN LOWER DRAIN PAN AND SLIDE ONTO DRAIN BOX BARB FITTING SECURING WITH SUPPLIED CLAMP IF OUTDOOR PAN IS BYPASSED WILL REDUCE RISK OF ALGAE GROWTH IN THE OUTDOOR PAN BUT AT A S...

Page 18: ...pply flanges before unit installation to help with duct connections inside the structure Supply ducts must be properly sized for the design airflow requirement of the equipment Air Conditioning Contra...

Page 19: ...T DRAIN OPT 3 375 7 000 2 000 2 000 OPTIONAL HIGH VOLTAGE FREEBLOW PLENUM OPTIONAL LOW VOLTAGE ELECTRICAL ENTRANCE ELECTRICAL ENTRANCE TOP VIEW SHOWN WITHOUT SUPPLY AIR OPENING TOP VIEW SHOWN WITHOUT...

Page 20: ...e various insulation grades of wiring material All wiring must conform to NEC and all local codes FIGURE 20 High Voltage Connections The electrical data on the serial plate in the unit specifications...

Page 21: ...input for Balanced Climate compressor cooling operation The Y2 terminal is the 24VAC input for compressor cooling standard operation Y1 and Y2 are connected with a brass jumper bar which can be remov...

Page 22: ...Cnet compatible CS9B THOCA 3 stage Cool 3 stage Heat Programmable Non Programmable HP or Conventional Auto or Manual Changeover Humidity Sensor w dehumidification CO2 Sensor Motion Sensor w Intelligen...

Page 23: ...only see vent instruction manuals 5 Change model configuration from heat pump to heat cool Must be configured to programmable and fan set to be programmed fan for the A output to function during sched...

Page 24: ...t installation manual 6 For vent operation add jumper if optional CO2 controller is not used Vent will run while blower is energized For ECON CRV V an additional wire change is required See install Ma...

Page 25: ...to instructions for the cylinder that is being utilized for proper method of liquid extraction Safety Practices 1 Never mix R 410A with other refrigerants 2 Use gloves and safety glasses Polyol ester...

Page 26: ...mpressors like several other types of compressors will only compress in one rotational direction Direction of rotation is not an issue with single phase compressors since they will always start and ru...

Page 27: ...l is sent to L terminal Low Pressure Switch Terminals LP1 and LP2 Circuit will be proved as closed prior to energizing A or CC terminals The condition of the LP terminals will then be ignored for the...

Page 28: ...lockout of the compressor circuit will occur requiring a manual system reset The compressor logic control board has five LED lights providing status updates of the system operation see Figure 24 When...

Page 29: ...fortable environment This mode will also increase the supply temperature when in heating mode When Balanced Climate mode is activated it is employed in both heating and cooling modes Balanced Climate...

Page 30: ...d based upon varied outdoor ambient conditions to optimize sound and unit efficiency 3 If the system is noisy freezing up running a high head pressure tripping the high pressure switch or compressor o...

Page 31: ...ardware to reduce vibration Make sure all wires are free of the fan blade and not pinched in mountings or cabinet through points Check line power to motor Check between red and black wires for line po...

Page 32: ...ine if it s air noise cabinet duct or motor noise interview customer if necessary Air noise High static creating high blower speed Is airflow set properly Does removing filter cause blower to slow dow...

Page 33: ...motor plug just removed to the motor shell is 100K ohms Refer to Figure 26 Measure to unpainted motor end plate If any motor lead fails this test do not proceed to install the control module THE MOTOR...

Page 34: ...ode Heat 1st Bank of Elec Heat Heat 1st 2nd Bank of Elec Heat Thermostat 24 VAC Input Signals G G Y1 G Y1 Y2 D G B W1 G B W1 W2 Pin 1 24 VAC C Common Signal Always Energized Pin 2 Not Used Pin 3 24 VA...

Page 35: ...e outdoor fan 3 The fan shroud and motor assembly can be removed from the unit by four 4 screws and the coil top fill then the six 6 screws from the shroud sides Fan motor must be unplugged from motor...

Page 36: ...Tables are based upon rated CFM airflow across the evaporator coil If there is any doubt as to correct operating charge being in the system the charge should be removed and system evacuated and recha...

Page 37: ...ld power conductors Refer to the National Electrical code latest version Article 310 for power conductor sizing CAUTION When more than one field power circuit is run through one conduit the conductors...

Page 38: ...Performance TABLE 11 Maximum ESP of Operation Electric Heat Only Values shown are for units equipped with standard 1 throwaway filter or 1 washable filter Derate ESP by 15 for 2 pleated filters Nomin...

Page 39: ...Manual 2100 752B Page 39 of 49 GRAPH 2 Q42A4D FAD Ventilation Delivery GRAPH 1 Q36A4D FAD Ventilation Delivery...

Page 40: ...Manual 2100 752B Page 40 of 49 GRAPH 3 Q48A4D FAD Ventilation Delivery...

Page 41: ...further heat transfer When the humidistat is satisfied the system automatically switches off The result is separate humidity control at minimum operating cost Dehumidification Sequence of Operation D...

Page 42: ...opened manually using the magnetic EEV service tool Bard P N 2151 021 shown in Figure 31 To do this remove the EEV stator coil red color with retaining nut on top slide the magnetic tool over the shaf...

Page 43: ...ange replace the relay Stator Coil Disconnect the stator from the valve and the control and measure the resistance of the windings using an electrical tester The resistance of both windings should be...

Page 44: ...6 8 36 6 700 98 6 37 6 470 100 4 38 6 250 102 2 39 6 030 104 40 5 830 105 8 41 5 630 107 6 42 5 440 109 4 43 5 260 111 2 44 5 080 113 45 4 910 114 8 46 4 750 116 6 47 4 590 118 4 48 4 440 120 2 49 4 3...

Page 45: ...ion Mode Circuit Diagram 4 WAY VALVE COMPRESSOR REHEAT COIL EVAPORATOR COIL EEV CHECK VALVE CONDENSER COIL SUCTION PRESSURE TRANSDUCER FOR EEV MIS 4017 A EVAPORATOR COIL CONDENSER COIL REHEAT COIL 4 W...

Page 46: ...G3 320 280 363 311 409 343 75 65 5 60 RH Total Cooling Btuh 38 700 17 100 37 100 12 600 35 100 8 200 Sensible Btuh 25 100 3 700 24 200 400 23 200 2 900 S T 0 649 0 216 0 652 0 032 0 661 0 Latent Btuh...

Page 47: ...G3 320 280 363 311 409 343 75 65 5 60 RH Total Cooling Btuh 38 700 17 100 37 100 12 600 35 100 8 200 Sensible Btuh 25 100 3 700 24 200 400 23 200 2 900 S T 0 649 0 216 0 652 0 032 0 661 0 Latent Btuh...

Page 48: ...arge PSIG3 339 292 382 323 428 354 75 65 5 60 RH Total Cooling Btuh 50 300 20 200 47 700 15 100 44 600 9 300 Sensible Btuh 32 200 3 500 30 700 0 29 100 4 400 S T 0 640 0 173 0 644 0 000 0 652 0 Latent...

Page 49: ...rips and Dehum Unoccupied X X X X X X X X X D Dehum Unoccupied X X X X D A Dehum Occupied X X X X X X TABLE 15 Dehumidification Relay Logic Board Cooling takes precedence over dehumidification A cooli...

Reviews: