background image

Page 

1 of 25

INSTALLATION, OPERATION & 

QUICK START GUIDE

Bard Manufacturing Company, Inc. 
Bryan, Ohio 43506
www.bardhvac.com

Manual: 2100-684
Supersedes: 

NEW

 

Date: 3-20-18

CompleteStat

TM

 Controller

Models:

CS9B-THOA
CS9B-THOCA

CS9BE-THOA
CS9BE-THOCA

Summary of Contents for CompleteStat CS9B-THOA

Page 1: ...ATION OPERATION QUICK START GUIDE Bard Manufacturing Company Inc Bryan Ohio 43506 www bardhvac com Manual 2100 684 Supersedes NEW Date 3 20 18 CompleteStatTM Controller Models CS9B THOA CS9B THOCA CS9...

Page 2: ...o Economizer 16 WD 2 Conventional 1H 1C or 2H 1C with Honeywell W7220 JADETM Control Economizer with or without Dehumidification 17 WD 3 Conventional 1H 2C or 2H 2C with Honeywell W7220 JADETM Control...

Page 3: ...n the bottom and top of the controller clockwise inward until they clear the cover Remove base plate from controller INSTALLATION 3 Route control wiring through base plate 4 With the embossed UP arrow...

Page 4: ...Setback 15 Heat Setback 16 Standby Time Minutes 17 Motion Sensing Daily Schedule 18 Date 19 Time 20 Occupied Minimum Cooling 21 Occupied Maximum Cooling 22 Unoccupied Minimum Cooling 23 Unoccupied Max...

Page 5: ...onds factory default is 120 seconds See page 14 in the latest version of CompleteStat Controller Advanced Programming Features 2100 685 for information on adjusting the inactivity setting NOTE If the...

Page 6: ...No economizer or standard vent package ERV CRV MFAD EN DIS Economizer in system FAN SETUP SPEEDS CONSTANT SPEED OFF DELAY SECS 0 UNOCC AUTO OCC AUTO FIGURE 5 Fan Setup Air Conditioner 3 Press ENTER b...

Page 7: ...8 8 Press UP or DOWN button to scroll through AUX HEAT screen choices W O LOCKOUT Auxiliary heat will activate regardless of compressor operation or outdoor air temperature factory default If W O LOCK...

Page 8: ...IONAL SETUP 7 The indoor blower can be set for ON or AUTO in either occupied or unoccupied conditions To access or change blower settings press DOWN button to scroll to FAN Press ENTER button to enter...

Page 9: ...EM ENABLE options use UP or DOWN buttons to scroll through choices AUTO factory default System is in Auto Changeover mode HVAC system will cycle heating and cooling automatically to stay within preset...

Page 10: ...The controller will not allow heating cooling setpoints to contradict one another or to be within a degree of conflicting operation NOTE Any system startup with indoor ambient temperatures lower than...

Page 11: ...r Output 24VAC SPST Relay SC Not Used 24VAC Hot O B Reversing Valve Output 24VAC SPST Relay G Indoor Blower Output 24VAC SPST Relay IN9 Not Used ROS Remote Occupancy Sensor Input Dry Contact Input to...

Page 12: ...tioning or through constant fan operation Operation G Y O Y1 Y2 W1 E W2 O B D A Fan Only X 1st Stage Cooling Economizer X X 2nd Stage Cooling X X X 3rd Stage Cooling if employed X X X X 1st Stage Heat...

Page 13: ...at must be configured for a heat pump application see Auxiliary Electric Heat Setup on page 7 Operation G Y O Y1 Y2 W1 E W2 O B D A Fan Only X 1st Stage Cooling X X 1st Stage Heating X X X X2 2nd Stag...

Page 14: ...ectric Heat Setup on page 7 Operation G Y O Y1 Y2 W1 E W2 O B D A Fan Only X 1st Stage Cooling X X X 2nd Stage Cooling X X X 3rd Stage Cooling X X X X 1st Stage Heating X X X X2 2nd Stage Heating X X...

Page 15: ...Factory T or W Economizer w JADE W7220 Control On Off 8 Gas Electric THOA THOCA A C 1H 1C None 1 Stage A C with Gas Heat CRV ERV MFAD On Off 9 Gas Electric THOA THOCA A C 1H 2C None 2 Stage A C with G...

Page 16: ...es and jumpers Factory installed wires and jumpers Wire for dehumidification units only 1 Remove jumper for 2 stage heat 15kW or more 3 Wire only for 2 stage cooling if available 4 W A2 units use D te...

Page 17: ...installed wires and jumpers Factory installed wires and jumpers Wire for dehumidification units only 1 Remove jumper for 2 stage heat 15kW or more 3 CompleteStat programmed for damper economizer Enabl...

Page 18: ...Factory installed wires and jumpers 1 Remove jumper for 2 stage heat 15kW or more 3 CompleteStat programmed for damper economizer Enable Disable 4 Field installed wire nut 1 2 3 3 4 CompleteStatTM WIR...

Page 19: ...alled wire nut on 9 EER W A2 A1 units For W AA units consult unit installation instructions 2 Field installed wires and jumpers Factory installed wires and jumpers Wire for dehumidification units only...

Page 20: ...wires and jumpers 1 Field installed wire nut 3 CompleteStat programmed for damper economizer Enable Disable 4 CH S Series heat pumps use DH dehumidification terminal CompleteStatTM WIRING DIAGRAM 8 G...

Page 21: ...ump Series with No Ventilation Wire for dehumidification units only 2 Field installed wires and jumpers Factory installed wires and jumpers 1 W G Series uses A terminal for ventilation 3 Wire not used...

Page 22: ...RAM 11 I TEC 2 Stage Heat Pump Series with CRV Ventilation Package Wire for dehumidification units only 2 Field installed wires and jumpers Factory installed wires and jumpers 1 Wire not needed if aux...

Page 23: ...ith ERV Ventilation Package and 8403 067 CO2 Detector Fully Modulating Wire for dehumidification units only 2 Field installed wires and jumpers Factory installed wires and jumpers 1 Wire not needed if...

Page 24: ...on Field installed wires and jumpers Factory installed wires and jumpers Q Series with factory installed thermostat had no terminal board and were wired directly from Plug 4 Use provided colors to wir...

Page 25: ...StatTM WIRING DIAGRAM 15 QW S Series 2 Stage Heat Pump with or without Dehumidification and Ventilation WIRING DIAGRAM 16 C H Heat Pump 2 Stage with Honeywell W7220 JadeTM Control Economizer with or w...

Reviews: