background image

M

EDIA

F

IXED

SL

ITE

D

ISPLAY

I

NSTALLATION

M

ANUAL

17102003

R5976575/02

Summary of Contents for SLite Series

Page 1: ...MEDIA FIXED SLITE DISPLAY INSTALLATION MANUAL 17102003 R5976575 02...

Page 2: ...Barco nv Media Noordlaan 5 8520 Kuurne Phone 32 56 36 89 70 Fax 32 56 36 88 24 E mail media barco com Visit us at the web www barco com Printed in Belgium...

Page 3: ...claims of the purchaser will be rendered invalid Not included in the guarantee coverage are system failures which are attributed to programs or special electronic circuitry provided by the purchaser...

Page 4: ......

Page 5: ...es 15 2 5 2 Data cables 17 2 6 Digitizer 18 2 7 Control Software 18 3 Physical installation 19 3 1 Installation of the Support Structure 19 3 2 Mounting the SLite tile 20 3 3 Cabling of the SLite disp...

Page 6: ...Table of contents 2 R5976575 FIXED SLITE DISPLAY 17102003...

Page 7: ...uring processes in order to achieve part strength Consult BARCO for assistance with custom applications Always follow BARCO Installation Instructions Contact BARCO if you should have any question rega...

Page 8: ...ents accessories specified by the manufacturer Disconnect the power to this apparatus during lightning storms or provide suitable additional lightning protection Unplug this apparatus when unused for...

Page 9: ...lled near the equipment and be easily accessible or a readily accessible general disconnect device shall be incorporated in the fixed wiring This equipment MUST be earthed In order to protect against...

Page 10: ...1 Safety 6 R5976575 FIXED SLITE DISPLAY 17102003...

Page 11: ...ral demands regarding strength wind load cooling humidity accessibility etc and also comply with the local regulations regarding such installations The support struc ture must be accessible from the r...

Page 12: ...an individual basis Never construct a wall if there is uncertainty regarding the stability of an installation or the load holding capabilities If there are doubts on a system s viability consult Barco...

Page 13: ...imate in picture quality The SLite is an IP65 rating rugged module and can be hot swapped which enables service of a display panel and its components while the rest of the display continues playing Im...

Page 14: ...ual resolution 14 mm Physical resolution 28 mm Horizontal viewing angle 120 Vertical viewing angle 60 Lifetime half brightness 50 000 h Power consumption panel Max 720 Avg 150 W Weight panel 34 kg Pro...

Page 15: ...there is a range of adapted Custom Power Boxes 2 4 1 Standard Mono Phase Power Box Introduction The small design of the Standard Mono Phase Power Box makes this power box suitable for applications in...

Page 16: ...PLUG E Standard Mono Phase Power Box A Image 2 5 Standard Mono Phase Power Box in a SLite configuration A Standard Mono Phase Power Box B Output cable C Power linking cable D SLite tile E Dummy power...

Page 17: ...up to ten These special outputs are not suitable for direct connection with the tiles but one output can be split up into six outputs by using a Spider Connector Each output of a Spider Connector can...

Page 18: ...phase 230V 4 outputs 72 R9851243 Custom Power Box 3 phase 230V 5 outputs 90 R9851244 Custom Power Box 3 phase 230V 6 outputs 108 R9851245 Custom Power Box 3 phase 230V 7 outputs 126 R9851246 Custom Po...

Page 19: ...image 2 11 R9850260 Waterproof power source cable C20 waterproof C19 waterproof 9 meter Used to distribute power from SLite tile to AEC or between Fiberlink Receiver and SLite tile image 2 12 R985126...

Page 20: ...utput cable image 2 14 and image 2 15 R9851662 Waterproof Spider connector with 6 power outputs C19 with custom lengths Spider support bracket included Used to distribute power from a multi power cabl...

Page 21: ...a from SLite tile to AEC or from Fiberlink Receiver to SLite tile image 2 19 R9851216 DVI MDR waterproof IN data cable of 5 meter Used to link data from D320 Digitizer to SLite tile image 2 20 R985121...

Page 22: ...with the Digitizer and Display this can be used when connected to the Digitizer through a serial RS232 connection Refer to the Manual of the Digitizer for more information about the Digitizer 2 7 Cont...

Page 23: ...essional rigging organizations Calibration tools for the SLite mounting plates BARCO provides mounting plates for the SLite tiles which has to be attached to the support structure To align the mountin...

Page 24: ...ed into the assembled and installed support structure Image 3 3 The following procedure must be performed by minimum three authorized and qualified technical persons which are thoroughly familiar with...

Page 25: ...persons are required at the front of the LED display to perform this action Both hands must be free to insert a tile in a LED wall Therefore the use of a ladder to insert a tile is forbidden Only a so...

Page 26: ...3 Physical installation Image 3 5 Image 3 6 22 R5976575 FIXED SLITE DISPLAY 17102003...

Page 27: ...ng slot Image 3 8 Place the SLite tiles beside one another from the middle of the row to the sides Image 3 9 Build the SLite Display row by row from bottom to top Image 3 10 Start mounting the next ro...

Page 28: ...ector is used to loop the data through The power ports consist in one waterproof C19 connector in the lower left corner and one waterproof C20 connector in the upper left corner of the connection modu...

Page 29: ...lowest tile in a column of maximum three 4 Complete each power branch by connecting a maximum of three tiles with power linking cables to each other in a daisy chain manner Warning Maximum 3 three ti...

Page 30: ...le of power cabling with a Mono Phase Power Box SLite Display Rear View A POWER DATA OUT IN AEC F Power linking cable D Power Box B Power output cable C Dummy power plug E POWER DATA OUT IN POWER DATA...

Page 31: ...ck colored ring for power red for data image 3 21 5 Start creating power branches by connecting the output cables of the Spider connector with the power input socket of the lowest tile in a column of...

Page 32: ...linking cable Image 3 20 Spider support bracket Image 3 21 Sealing rings A Red sealing ring for DATA IN and DATA OUT sockets B361595 B Black sealing ring for POWER IN and POWER OUT sockets B361243 Im...

Page 33: ...This daisy chain linking can be performed either in the horizontal or vertical directions starting in a corner of the SLite display 4 Place a Dummy Data plug on the Data OUT connector of the last til...

Page 34: ...3 25 A Client B Network C SLite display rear view D AEC E Data cables are daisy chained to all tiles F First tile may be in any corner G Last tile will be in a corner It s recommended that the data ca...

Page 35: ...BARCO parts are allowed 4 2 Removing a SLite tile What has to be done Removing an installed SLite tile from the LED wall in a secure manner This can only be done via back and front access at the same...

Page 36: ...ckets are sealed up using a power and data linking cable 6 The person at the rear of the LED wall grabs the SLite tile by the rear handles and pushes the tile gently a little bit forward out of the LE...

Page 37: ...4 Servicing Image 4 9 Image 4 10 R5976575 FIXED SLITE DISPLAY 17102003 33...

Page 38: ...4 Servicing 34 R5976575 FIXED SLITE DISPLAY 17102003...

Page 39: ...and data linking cable Make sure that all plug holder clamps are locked firmly 2 Place the tile flat on a solid table with the LED s facing upwards and vaporize through different directions the window...

Page 40: ...5 Maintenance 36 R5976575 FIXED SLITE DISPLAY 17102003...

Page 41: ...s 25 27 Custom Power Box 27 Mono Phase Power Box 25 Power Box 11 13 Custom 13 Mono Phase 11 Power Boxes 11 Power cables 15 R Remove 31 SLite tile 31 S Safety 3 4 Guidelines 3 Important Instructions 4...

Reviews: