![background image](http://html1.mh-extra.com/html/barco/icon-h250/icon-h250_owners-manual_3842195117.webp)
8. Network centric operations
The window is added to the layout.
Image 8-11
4. When entering the PiP screen the cursor is replaced by a hand, Click on the window to be repositioned.
The window is surrounded by a white frame.
5. Drag the window to the desired position.
6. Place the cursor on one of the corners of the window to be re sized.
A double arrow is displayed.
7. Drag to re size.
Note:
the window is re sized by keeping the same aspect ratio.
Importing/exporting a layout
Every PiP layout can be exported and saved as backup on the network or on the hard disk of the Client PC.
It can then be imported at any time.
How to import/export a layout ?
1. Click on the
Export
button.
A dialog box is displayed.
Image 8-12
2. Browse to the desired location and fill in the filename.
How to import a layout ?
1. Click on the import button.
R5976992 ICON H250/400 13/12/2006
111
Summary of Contents for iCon H250
Page 1: ...iCon H250 400 Owners manual Preliminary R9010510 R9010500 R5976992 0A 13 12 2006...
Page 10: ...Table of contents 4 R5976992 ICON H250 400 13 12 2006...
Page 34: ...5 Connections 28 R5976992 ICON H250 400 13 12 2006...
Page 60: ...6 Setup 54 R5976992 ICON H250 400 13 12 2006...
Page 103: ...7 Advanced Image 7 84 R5976992 ICON H250 400 13 12 2006 97...
Page 130: ...8 Network centric operations 124 R5976992 ICON H250 400 13 12 2006...
Page 144: ...11 SNMP services 138 R5976992 ICON H250 400 13 12 2006...
Page 146: ...12 Maintenance 140 R5976992 ICON H250 400 13 12 2006...
Page 152: ...13 Image files 146 R5976992 ICON H250 400 13 12 2006...