8. Communicator Touch Panel
8.2
Installing the Touch Panel interface
Necessary tools
•
open-end wrench 17 mm
•
open-end wrench 10 mm
How to install the Touch Panel interface onto the top of the projector?
1. Assemble the mounting plate and the swivel arm together as illustrated. First place the nut (reference 1 image 8-4) upon the
rod of the mounting plate, then add the lock washer (reference 2 image 8-4), then fasten the mounting plate and the swivel arm
together. When the arm is mounted, turn the nut (reference 1 image 8-4) against the arm to secure the position.
1
2
Image 8-4
2. Slide a washer (reference 4 image 8-5) over the base of the swivel arm (reference 3 image 8-5) and insert the base of the swivel
arm into one of the four possible mounting holes (reference 1 & 2 image 8-5) at the top of the projector.
Note:
Which mounting hole to use depends on the operator preferences. In the illustration below the swivel arm is installed
into the mounting hole nearest by the Local Keypad of the projector.
Caution:
If you choose to use the back mounting holes (reference 1 image 8-5) to mount your Touch Panel, ensure it is suf
fi
-
ciently removed from the hot top exhaust system, to avoid damage.
1
2
3
4
Image 8-5
3. Place the Touch Panel interface upon the mounting plate of the swivel arm and fasten the two wing nuts (reference 5 image 8-6)
as illustrated.
86
R5906847 DP2K SLP SERIES 02/06/2017
Summary of Contents for DP2K SLP Series
Page 1: ...DP2K SLP Series User and Installation manual R5906847 00 02 06 2017 ...
Page 4: ......
Page 15: ...1 Safety PR RESTRICTED AREA RESTRICTED AREA Image 1 2 R5906847 DP2K SLP SERIES 02 06 2017 11 ...
Page 18: ...1 Safety 14 R5906847 DP2K SLP SERIES 02 06 2017 ...
Page 44: ...5 Lenses Lens selection 40 R5906847 DP2K SLP SERIES 02 06 2017 ...
Page 86: ...7 ICMP 82 R5906847 DP2K SLP SERIES 02 06 2017 ...
Page 96: ...9 Starting up 92 R5906847 DP2K SLP SERIES 02 06 2017 ...
Page 108: ...10 Scheimpflug 104 R5906847 DP2K SLP SERIES 02 06 2017 ...
Page 116: ...11 Convergence 112 R5906847 DP2K SLP SERIES 02 06 2017 ...
Page 124: ...13 Preventative maintenance actions 120 R5906847 DP2K SLP SERIES 02 06 2017 ...
Page 162: ...B Pin configurations 158 R5906847 DP2K SLP SERIES 02 06 2017 ...
Page 172: ...C Environmental information 168 R5906847 DP2K SLP SERIES 02 06 2017 ...