background image

Projector Components

B Series

C Series

— Used for controlling, set-up and projector maintenance (e.g., resetting the lamp 

run-time when a new lamp is installed).

— Provides power and communication for the Touch Panel.  

:  To avoid connector damage, align the pins before you connect the cable.

— Removes heat from lamp house.  Must be connected to external extraction system.  

:  The extraction system must be running.  A flexible duct must be installed.

— Automatically adjusts the image between screen formats when a 

macro is selected.  Always remove the lens cap prior to use.  

— Used for communication, GPIO, and alternative content connections to the projector.

— Used to switch lamp and dowser on or off.  Also used for macro selection, lens 

adjustments and selection of test patterns.

— Powers the projector head off, but the LPS units remain on.  

.  Voltage is still present in the B series LPS when the Mains Switch is off. 

= System OK

= Error condition

= Warning

= Maintenance notification

Input Cover

Lamp Cover

Front Cover

Left Side Cover

Rear Cover

Front Cover

Rear Cover

Input Cover

Lamp Cover

— Powers projector on and off.  Shuts off all electrical connections.  

:  For all projectors, the lamp must be cooled down for 10 minutes before switching off.

High voltage and strong UV 
radiation is present in these 
projectors!

To prevent personal injury, electrical shock, 
exposure to UV radiation and fire hazard, 
always refer to the “Safety” chapter in any 
DP2K Installation Manual.   

Quick Start Guide — Operators

Left Side Cover

QSG_DP2K_Operator_EN_110208

Reviews: